Published June 12, 2019 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a water / sewer project in East Bangor, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Cost Estimate: $30,000 - $60,000 Bids will only be accepted from entities on the official Bidders List maintained by the Engineer. All bids submitted shall be sealed, and clearly marked with the Bidders name, address and applicable project. It is the responsibility of the Bidders to familiarize themselves with the project prior to submitting bids. A certified check payable to the order of East Bangor Municipal Authority, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to Ten percent (10%) of the total of the Bid, shall be submitted with each bid. The successful bidder will be required to furnish satisfactory Performance and Payment Bonds in the amount of one hundred percent (100%) of the Contract amount. The successful bidder will be required to comply with all applicable laws and regulations including, but not limited to compliance the Pennsylvania Prevailing Wage Rate Act and the Pennsylvania Steel Procurement Act. Bids may be held by the East Bangor Municipal Authority for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The East Bangor Municipal Authority reserves the right to reject any and all bids and also reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the Authority Wayne Jones East Bangor Municipal Authority

Award

Water / Sewer

$79,750.00

Public - City

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Unit Prices, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, References, Definitions, Execution and Closeout Requirements, Examination and Preparation, Execution, Cutting and Patching, Cleaning and Waste Management, Progress Cleaning
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Electric Domestic Water Heaters, Residential, Collector-to-Tank, Solar-Electric Domestic Water Heaters, Residential, Collector-to-Tank, Heat-Exchanger-Coil, Solar-Electric Domestic Water Heaters
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, Air Outlets and Inlets, Central Heating Equipment, Solar Energy Heating Equipment
Division 26 - Electrical

Division 26 - Electrical

Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 42 - Process Heating, Cooling, and Drying Equipment

Division 42 - Process Heating, Cooling, and Drying Equipment

Process Heating Equipment, Process Heaters, Solar Process Heaters, Industrial Heat Exchangers and Recuperators, Industrial Solar Radiation Heat Exchangers
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment
Division 48 - Electrical Power Generation

Division 48 - Electrical Power Generation

Electrical Power Generation Equipment, Solar Energy Electrical Power Generation Equipment, Wind Energy Electrical Power Generation Equipment

Find More Local Projects

Within 75 Miles of This Project
490
Active Projects
256
Bidding Soon
4,375
All Active Projects
2,031
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 5, 2019

July 5, 2019

img_map_placeholder

S Broad St, East Bangor, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

East Bangor Municipal Authority South Broad Street Booster Station Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.