Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 9, 2019 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Greenacres, Florida. Conceptual plans call for the renovation of a educational facility.

Lightning Protection System Repairs at John I Leonard High School Work shall be completed per UL96A, LPI175, and NFPA 780 lightning protection standards Repair the system on the rooftops of five buildings at John I Leonard High School Q & A deadline: Jun 05, 2019 2:00:00 PM EDT

Project Abandoned

Educational

$20,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
133
Bidding Soon
1,794
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 11, 2019

August 31, 2019

Project location map

4701 10th Ave N, Greenacres, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed