BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 24, 2019 at 8:00 PM

Updated June 16, 2026

Renovation of a military facility in Winnipeg, Manitoba. Completed plans call for the renovation of a military facility.

The purpose of this Invitation to Tender (ITT) is for BGIS, to obtain offers from interested and qualified construction professionals to perform the work as outlined below. Gate Valves: .1 Ensure there is no steam pressure in the lines affected by gate valve replacement. Relieve residual steam pressure in low, medium, and high pressure lines as required .2 Remove and replace Gate Valve-1. Note that Gate Valve-1 is a priority and is to be scheduled during the Central Plant Shutdown .3 Remove and replace Gate Valve-2 .4 Remove and replace Gate Valve-3 .5 Replace all piping and fittings and valve insulation as required Pressure Reducing Valves .1 Ensure there is no steam pressure in the lines affected by the pressure reducing valve replacement .2 Relieve residual pressure as necessary .3 Replace Pressure Reducing Valves .4 Re-orientate strainers to match manufacturers approved orientation for use .5 Replace all insulation impacted by the work above Pressure Relief Valve and Pipe .1 Ensure there is no steam pressure in the line to be affected by the pressure relief valve and pipe replacement .2 Remove pressure relief pipe .3 Remove pressure relief valve .4 Paint and install pressure relief pipe and valve .5 Patch and repair roof to original state to prevent leaking through penetration After the completion of all the above-mentioned work, ensure all valves are set to operational condition as identified and insulated. * Award subject to final approval.

Award

Military

$55,559.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
102
Bidding Soon
699
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2019

July 17, 2019

Project location map

501 University Crescent, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.