Site work for a water / sewer project in Santee, California. Completed plans call for site work for a water / sewer project.

**The anticipated Notice to Proceed date would be in late August, and it’s a 500 calendar day contract. The project is located on Mountain View Road, Frances Drive, and Harbison Canyon Road in unincorporated El Cajon, California. The scope of work includes, but is not necessarily limited to, the following: Provide mobilization, demobilization, bonds and insurance. Procure County of San Diego permits required to perform the work. Prepare, submit, and implement traffic control plans approved by the County of San Diego. Prepare, submit to the State Water Resources Control Board, implement, and comply with a Stormwater Pollution Prevention Plan throughout the construction period. Prepare and implement a Fire Prevention and Emergency Access Plan, including provision of a water truck onsite for the purpose of extinguishing accidental fires. Provide temporary facilities, including a field trailer, sanitary facilities, and utilities.Prior to, during, and at completion of major phases of work, professionally photograph and video existing improvements in and adjacent to the project work areas, including roads used for the Contractors vehicle traffic. Construct approximately 11,500 LF of 16-inch ductile iron, double polyethylene wrapped pipeline including appurtenances such as blowoffs, fire hydrants, line valves, and combination air release and vacuum valves. Construct two tie-ins to the Districts existing water system Relocate or replace water services as shown in the plans. Provide environmental mitigation and permit compliance measures.. Provide conventional excavation as required to perform the Work in accordance with the Contract Documents. Provide rock excavation in accordance with the Contract Documents. Remove unsuitable soil materials and provide replacement materials as required to perform the Work in accordance with the Contract Documents.. Import soil materials as required to perform the Work in accordance with the Contract Documents. Provide final trench repair paving. At the end of the project, perform up to 6,900 square yards of pavement repairs (digouts) in Mountain View Road and Frances Drive as directed by the District These repairs are in addition to trench repair paving. This item does not include damage to existing paving caused by the Contractor. At the Districts Mountain Top Reservoir Site: Perform CCTV inspection of existing 16-inch inner diameter steel pipe. Construct a flow control valve vault and piping. Coordinate with San Diego Gas & Electric for standby as called out in the plans. Provide minor grading. Technical questions regarding the Contract Documents should be referred to the District Project Engineer, Robin Bier, P.E. at (619) 258-4646 or via e-mail at rbier@padre.org.

Award

Water / Sewer

$6,952,485.00

Public - County

Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Exploratory Excavations, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Common Work Results for Fire Suppression, General-Duty Valves for Water-Based Fire-Suppression Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Watering, Common Work Results for Exterior Improvements, Soils for Exterior Improvements, Aggregates for Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Storm Drainage Utilities, Storm Utility Drainage Piping
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
47
Bidding Soon
991
All Active Projects
420
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 16, 2019

August 30, 2019

img_map_placeholder

Multiple Locations, Santee, CA


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Mountain View Connector Pipeline Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.