Published August 23, 2019 at 8:00 PM

Updated October 22, 2025

Renovation of a civil project in Palm Bay, Florida. Completed plans call for the renovation of a water / sewer project.

The renewal and replacement (R&R) improvements at the North Regional Wastewater Treatment Plant (NRWWTP), located at 1105 Clearmont St., in Palm Bay, includes three work areas: RAS/WAS, Headworks and Digester. Per the Technical Specifications and Plans the work may include removal and replacement of, but not limited to, the following: 1. RAS/WAS Pump Station: a. The Contractor will demolish and replace the existing canopy structure. b. The Contractor will remove and replace the RAS pumps, WAS pump, and scum pumps. c. The Contractor will remove and replace the above grade piping, valves, flow meters, and appurtenances to the first fitting above grade. d. The Contractor will sandblast and repaint the existing piping to a depth of one foot below grade. e. The Contractor will relocate the existing RTU panel onto the existing concrete slab at the location shown on the Drawings. f. The Contractor will install variable frequency drives for the RAS and WAS pumps. g. The Contractor will install new lighting for the RAS/WAS Pump Station. 2. Headworks: a. The Contractor will remove the existing mechanical bar screen and screw press and install a new mechanical screen and screw press, associated controls, discharge piping, and appurtenances. b. The Contractor will remove and replace six (6) slide gates. c. The Contractor will remove the existing floor hatch and patch the opening and install a new floor hatch. d. The Contractor will complete all structural concrete work as shown on the Drawings. 3. Digester: a. The Contractor will drain and clean the digester tank. b. The Contractor will remove and replace the existing walkway structure and aerator mechanism inside the digester tank, including mooring posts, platform, and mooring arms. The existing floats will be reused for the new aerator mechanism. c. The Contractor will remove and replace the above ground interconnecting piping as shown on the Drawings. d. The Contractor will recoat the exterior tank wall. Any uncertainty regarding the time a Bid is received will be resolved against the Bidder. In Addition, the Bidder's Name, Address and Florida Contractor's License Number Shall Be Shown on the Outside of the Sealed Envelope. If Submitted by Mail, the Sealed Envelope Shall Be Enclosed in a Separate Mailing Envelope With the Notation "Sealed Bid Envelope Enclosed" on the Face Thereof. The City of Palm Bay reserves the right to waive technicalities, irregularities or formalities; to reject any or all Bids; and to accept that Bid which is in the best interest of the City of Palm Bay. Bidders must comply with the President's Executive Orders Nos. 11246 and 11375 which prohibit discrimination in employment regarding race, creed, color, sex or national origin. Bidders must certify that they do not, and will not, maintain or provide for their employees any facilities that are segregated on the basis of race, color, creed or national origin. Additional information can be obtained by contacting the person identified in the bid/proposal document. Bids will be received for the project as set forth on the Bid Form, and the award, if made, will be made to the lowest responsible and responsive Bidder whose qualifications indicate the award will be in the best interest of the City of Palm Bay The City reserves the right to waive any bid/proposal informality or technicality and to accept or reject any or all bids/proposals, whichever serves the best interest of the City of Palm Bay.

Award

Water / Sewer

$1,683,700.00

Public - City

Renovation

45

1

12

10

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2019

September 18, 2019

Project location map

1105 Clearmont St NE, Palm Bay, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.