Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 15, 2021 at 7:00 PM
Updated September 18, 2023
Site work, paving and renovation of a bridge / tunnel in Mount Vernon, New York. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
“As of February 15,2021, this project has not yet been awarded. A timeline for award has not yet been established.” The project consists for Design Build services for 3rd Avenue Bridge Replacement at Mt. Vernon NY. Contract term: 18 months. Service-Disabled Veteran-Owned Set Aside: No. Disadvantaged Owned Sub-Contracting Goal: 20% The engineer's estimate is in range of 7 Million- 11 Million The scope of work of the contract generally consists of the design, demolition and construction for the replacement of the superstructure and rehabilitation of the substructure of the 3rd Avenue Bridge (NH 13.66) for the Metro-North Railroad (MNR).
Post-Bid
Bridges / Tunnels
$11,000,000.00
Public - State/Provincial
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
