BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 11, 2020 at 7:00 PM

Updated April 15, 2025

Site work and new construction of a mixed-use development in Newport Beach, California. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

As of December 11,2020 the contractor is RC Construction which was awarded the project for $6,289,000.00 with a start date of 1/19/2021. https://www.latimes.com/socal/daily-pilot/news/story/2020-11-12/newport-beach-approves-6-3-million-contract-for-fire-station-at-28th-street-and-newport-boulevard The new fire station will replace the one on 32nd Street, which city staff said has exceeded its useful life. _________________________ The work necessary for the completion of this contract consists of:Obtaining City Building Permits; removing and disposing of the existing on/off-site improvements; surveying; WQMP; constructing new Fire Station, public restrooms and the associated utilities; constructing on/off-site improvements; containing all construction debris onsite; removing and disposing of errant debris; arranging and coordinating with utility companies and U.S. Digital (alerting system) installations; testing for building water tightness; and landscaping establishment and maintenance. Department of Industrial Relations (DIR) Noticing: No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)].No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. The City reserves the right at any time during the term of the Contract to change the amounts and types of insurance required by giving Contractor ninety (90) calendar days advance written notice of such change. If such change results in substantial additional cost to Contractor, City and Contractor may renegotiate Contractor's compensation. Contractor License Classification(s) required for this project: "B" For further information, call Peter Tauscher, Project Manager at (949) 644-3316 Contractor shall obtain, provide and maintain at its own expense during the term of this Contract both of the following: (1) a Faithful Performance Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract in the form attached as Exhibit B and incorporated herein by reference; and (2) a Labor and Materials Payment Bond in the amount of one hundred percent (100%) of the total amount to be paid Contractor as set forth in this Contract and in the form attached as Exhibit A and incorporated herein by reference

Award

Fire / Police

$6,289,000.00

Public - City

New Construction, Site Work

119

33

2

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
25
Bidding Soon
2,598
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2020

January 19, 2021

Project location map

2807 Newport Blvd, Newport Beach, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.