BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Packwood, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for the renovation of a bridge / tunnel.

Contract Award Date: May 26, 2022 Contract Award Number: 69056722C000014 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: Contractor Awarded Name: Tucci & Sons, Inc. Contractor Awarded Address: Tacoma, WA 98443 USA Base and All Options Value (Total Contract Value): $30728397.10 As of April 8, 2022, the project has not yet been awarded. A timeline for award has not been confirmed. WA NPS MORA 13(7), Rehabilitate Stevens Canyon Road, MP 5.0 to 14.0, Mount Rainier National Park, Lewis County, Washington. Location: 20 miles Northwest of Packwood, WA The work consists of Grading, stone masonry, walls, paving, drainage, signing, striping, waterproof membrane, concrete gutter repair and other small items of work. See "Description of Work" for additional details All project work is located in Mount Rainier National Park, Lewis and Pierce Counties, Washington. Fire HStevens Canyon Road - work consists of grading, paving, stone masonry repair, paved waterway repair, concrete repair, drainage improvements, signing, striping, subexcavation. Nisqually to Paradise Road Ricksecker Point - pave the existing loop road Paradise Parking Area - install drainage improvements near Paradise Inn Christine Falls Bridge - construct bridge repairs Length: 9.5 miles Tentative Completion Date: Fall 2020 Estimated Price Range: Between $15 Million and $20 Million. This Solicitation is Offered as a Full and open competition. All technical questions must be submitted by email wfl.plansspec@dot.gov or FAX 360-619-7932 General Questions - Contact our office at wfl.contracts@dot.gov or at 360-619-7520. New estimated schedule is to advertise the project for construction in late summer/early fall (September-November time frame) and then begin construction in 2021. If anything should change a notice will be posted through BetaSAM; therefore, we encourage interested contractors to check the site periodically. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$30,728,397.00

Public - Federal

Paving, Renovation, Site Work

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
35
Bidding Soon
686
All Active Projects
252
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 15, 2022

May 9, 2022

img_map_placeholder

Multiple Locations, Packwood, WA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.