BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 28, 2026 at 8:00 PM

Updated May 29, 2026

Site work, paving and renovation of a bridge / tunnel in Packwood, Washington. Completed plans call for the renovation of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The work consists of replacing the Fryingpan Creek Bridge with a new single-span, 218.5-foot steel plate girder bridge with a cast-in-place concrete deck, supported on deep foundation drilled-shaft abutments, and demolishing the existing steel arch girder bridge once the new structure is complete. The project includes roadway realignment, construction of a parking lot, minor pipe-culvert replacement, stone masonry, and placement of associated roadway features along approximately 0.27 miles of project length. Work also includes construction of a separator wall and other associated structural elements necessary to complete the bridge replacement. Location: Fryingpan Creek Bridge, approximately 31 miles north of Packwood, Washington. The price range of the project work is between $15,000,000 and $25,000,000. requests for technical information about this project will only be accepted in writing. Submit questions via e-mail at wfl.plans-spec@dot.gov. The Method of Contractor Selection has not been determined at this Time.

GC Bidding

Bridges / Tunnels

$25,000,000.00

Public - Federal

Paving, Renovation, Site Work

171

13

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
117
Bidding Soon
1,871
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 18, 2026

August 4, 2026

Project location map

To Be Determined, Packwood, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.