Site work and paving for a mixed-use development in Corpus Christi, Texas. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

The Packery Channel Restoration Project consists of repairs to shoreline protection and related appurtenances at Packery Channel, a tidal channel connecting Corpus Christi Bay to the Gulf of Mexico that supports recreational boat traffic. Work includes: Demolition and removal of damaged articulating block mat revetment, concrete walkway, and bollard/cable barriers; Construction of riprap revetment; Placement of riprap as toe protection along the landside section of two jetties; Re-setting displaced riprap and armorstone blocks along two jetties; Construction of new concrete walkway; Construction of a drainage swale lined with concrete block mats; Improvements to five existing storms drains; Construction of five new storm drains; Replacement of a section of aluminum handrail along one jetty as per the attached plans and specifications. The Federal Emergency Management Agency (FEMA) will partially fund this project, therefore, this contract is subject to all relative federal requirements All inquiries or requests regarding this RFB must be submitted in writing Electronically only using the electronic question submission feature specific to this RFB. Such inquiries or requests must be submitted by the due date and time for clarifications provided in this RFB. Any attempt to question City employees regarding this RFB outside may result in the City disqualifying that Bidder. Only written responses in will be binding regarding inquiries requesting clarification or additional information. Written responses will be released in the form of an Addendum. Bidders must acknowledge receipt of all Addenda. The deadline to ask questions is 8/25/2021 5:00 PM CST the amount of 5 percent (5%) of the greatest amount bid. Failure to provide the required Performance and Payment Bonds will result in forfeiture of the Bid Security to the City as liquidated damages. The Work is required to be substantially completed within 270 days. substantially completed within 270 390 days

Bid Results

Water / Sewer

$12,359,049.00

Public - City

Paving, Site Work

80

23

9

5

Subscribe For Documents

124 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
7
Bidding Soon
208
All Active Projects
89
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2021

October 1, 2021

img_map_placeholder

SH-361 bridge and the Gulf of Mexico, Corpus Christi, TX

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.