BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 11, 2021 at 7:00 PM

Updated September 15, 2023

Site work for a civil project in Corpus Christi, Texas. Completed plans call for site work for a water / sewer project.

Project includes rehabilitation and improvements to the Salt Flats Levee System per the attached specifications. Remove 130' Crib Wall and replace with a Retaining Wall to top elevation +13.0 feet (NAVD88).Repair Delaminated Concrete Support on south side of E. Port Ave. Closure Structure.Replace 5 of the 9 existing Storm Outfall Flap Gates with new Slip-In Check Valves. There a are total of 9 Storm Outfalls. 1 Outfall opening is a box culvert and other is blocked, hence these 2 are not part of the scope. 2 Storm Outfalls are inside the area of Harbor Bridge Construction. The City has instructed the Design Engineer to exclude those two Outfalls from the current design. The City will coordinate with TxDOT and Harbor Bridge Contractor for the restoration of SFL in that area. Therefore, only 5 Storm Outfall Flap Gates will be replaced with new SIip-In Check Valves in this scope. Remove Trees that could impact the structural integrity of the earthen levee. Investigate the 5 known pipe penetrations for issues that might create a destabilizing effect on the levee during a prolonged flood event (current scope includes CCTV and analysis only). The Design Engineer coordinated with City's Stormwater Department and Video Plumbing contractor to finalize the inlet pipe condition assessments. The CCTV results indicate minor to medium damage inside the pipes. Outfall 3 and 5 showed chipped bells inside the pipes. Outfall 7 showed broken part of concrete and longitudinal crack inside the pipe. Based on Citys review and approval, the 100% Design Submittal includes an additional scope of Outfall 7 rehabilitation by an addition of a flexible lining inside of the pipe. Reconstruct the levee from STA. 16 + 74 to 26 + 66 with a top elevation of 13' (NAVD88). The new levee top will transition to match existing elevation September 1, 2021 by 4:00 PM (CT) Requests for Clarification from Bidders are due, September 9, 2021 Responses to Requests for Clarification will be posted via Addendum electronically October 2021 Projected Date Award of Contract, October 2021 Anticipated Notice to Proceed The work is to be substantially completed within 120 days Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form, refers to individual instrument. The Work is required to be substantially completed within 120 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and isto be completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions within 150 days after the date when the Contract Times commence to run.

Award

Water / Sewer

$903,679.00

Public - City

Site Work

Subscribe For Documents

83 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
47
Active Projects
17
Bidding Soon
390
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2021

October 1, 2021

Project location map

E Port Ave, Corpus Christi, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.