Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a transportation facility in Pikeville, Kentucky. Completed plans call for site work for a transportation facility.
Project consists of furnishing all labor, materials and equipment and performing all work necessary to complete the Runway 9-27 Dip Repair Project. LYNN ID# 19-549 Each sealed proposal shall be accompanied by a certified check, cashier's check, or satisfactory bid bond, in a sum that is not less than five (5) percent of the aggregate amount of bid, payable to the Pikeville/Pike County Airport Board. The successful bidder will be required to execute Contract and to provide Contract Surety in an amount equal to one hundred (100) percent of the bid amount for performance, and a bond in the amount equal to one hundred (100) percent of the bid amount guaranteeing the payment of all labor, materials, and etc. Rights to waive any formality in any proposed guarantee, to reject any and all bids, and to negotiate with the apparent low bidder to such extent as may be necessary, are reserved. No bidder may withdraw his bid for a period of one hundred twenty (120) calendar days after the scheduled closing time for the receipt of bids. Bids may be held by the Pikeville/Pike County Airport Board for a period not to exceed one hundred twenty (120) calendar days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. Questions may be directed to Susan Rich, PE, Stantec, 10509 Timberwood Circle Suite 100 Louisville, KY 40223; Telephone: 502-212-5012. Email: susan.rich@stantec.com All questions are due by 5:00 PM on November 8, 2019. Goals for minority participation for each trade: 7.0% Goals for female participation in each trade: 6.9% These goals are applicable to all of the Contractor's construction work (whether or not it is Federal or federally assisted) performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, it shall apply the goals established for such geographical area where the work is actually performed. With regard to this second area, the Contractor also is subject to the goals for both its federally involved and non-federally involved construction.
Post-Bid
Transportation Terminals
$85,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 12, 2019
December 12, 2019
330 Airport Rd, Pikeville, KY
Related To This Project
Pikeville, KY
Bid Date: Aug 16 2022
Pikeville, KY
Bid Date: Dec 10 2021
Pikeville, KY
Bid Date: Sep 14 2022
Pikeville, KY
Bid Date: Jan 10 2023
Pikeville, KY
Bid Date: Aug 18 2022
Pikeville, KY
Bid Date: Jun 23 2022
Pikeville, KY
Bid Date: Jul 05 2022
Pikeville, KY
Bid Date: Aug 15 2019
Pikeville, KY
Bid Date: May 26 2022
Pikeville, KY
Bid Date: Oct 27 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.