BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 14, 2020 at 8:00 PM

Updated May 24, 2025

Renovation of an educational facility in Vermillion, South Dakota. Completed plans call for the renovation of a 11,790-square-foot, one-story above grade educational facility.

As of October 14,2020 the project was awarded to L & L Builders Company but the awarded amount was not confirmed . The start and completion date has not yet been determined. Bidder further agrees the Plans and Specifications are the sole property of the State; Each bid in excess of $50,000.00 must be accompanied by a certified check, cashier's check, or draft in the amount of 5% of the base bid and all add alternates and drawn on a State or National Bank, or a 10% bid bond issued by a surety authorized to do business in the State of South Dakota and made payable to the Board of Regents of the State of South Dakota. The BOR reserves the right to reject any or all bids and to waive any irregularities therein. The Project consists of the fourth-floor dorm room and corridor renovation & improvements of Richardson Hall at USD. DESCRIPTION OF ALTERATIONS WORK A. Scope of demolition and removal work is indicated on drawings and specified in Section 02 4100. B. Scope of alterations work is indicated on drawings. C. Renovate fourth loor, complete interior finishes including fire suppression and electrical work: 1. Walls, Floors, and Ceilings: Metal stud with gypsum board, doors & frames, casework, flooring, interior painting and acoustical panel ceilings. D. Electrical Power and Lighting: Alter existing and add new construction. E. Fire Suppression Sprinklers: Alter existing and add new construction. F. Fire Alarm: Alter existing and add new construction. G. Owner will remove the following items before start of work: 1. Door hardware cores prior to removal of doors and frames.. H. Contractor shall remove and store the following prior to start of work, for later reinstallation by Contractor: 1. Remove and salvage the evacuation map on the backs of all doors and reinstall on new doors..

Award

Educational

$562,600.00

Public - State/Provincial

Renovation

20

22

11

4

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
51
Bidding Soon
478
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2020

November 30, 2020

Project location map

414 E Clark St, Vermillion, SD

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.