Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 14, 2020 at 8:00 PM
Updated May 24, 2025
Renovation of an educational facility in Vermillion, South Dakota. Completed plans call for the renovation of a 11,790-square-foot, one-story above grade educational facility.
As of October 14,2020 the project was awarded to L & L Builders Company but the awarded amount was not confirmed . The start and completion date has not yet been determined. Bidder further agrees the Plans and Specifications are the sole property of the State; Each bid in excess of $50,000.00 must be accompanied by a certified check, cashier's check, or draft in the amount of 5% of the base bid and all add alternates and drawn on a State or National Bank, or a 10% bid bond issued by a surety authorized to do business in the State of South Dakota and made payable to the Board of Regents of the State of South Dakota. The BOR reserves the right to reject any or all bids and to waive any irregularities therein. The Project consists of the fourth-floor dorm room and corridor renovation & improvements of Richardson Hall at USD. DESCRIPTION OF ALTERATIONS WORK A. Scope of demolition and removal work is indicated on drawings and specified in Section 02 4100. B. Scope of alterations work is indicated on drawings. C. Renovate fourth loor, complete interior finishes including fire suppression and electrical work: 1. Walls, Floors, and Ceilings: Metal stud with gypsum board, doors & frames, casework, flooring, interior painting and acoustical panel ceilings. D. Electrical Power and Lighting: Alter existing and add new construction. E. Fire Suppression Sprinklers: Alter existing and add new construction. F. Fire Alarm: Alter existing and add new construction. G. Owner will remove the following items before start of work: 1. Door hardware cores prior to removal of doors and frames.. H. Contractor shall remove and store the following prior to start of work, for later reinstallation by Contractor: 1. Remove and salvage the evacuation map on the backs of all doors and reinstall on new doors..
Award
Educational
$562,600.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 10, 2020
November 30, 2020
414 E Clark St, Vermillion, SD
Related To This Project
Vermillion, SD
Bid Date: Jun 24 2025
Vermillion, SD
Bid Date: Jun 19 2025
Vermillion, SD
Bid Date: Jul 22 2025
Vermillion, SD
Bid Date: Jul 02 2025
Vermillion, SD
Bid Date: Jul 01 2025
Vermillion, SD
Bid Date: Jul 17 2025
Vermillion, SD
Bid Date: Aug 12 2025
Vermillion, SD
Bid Date: Sep 30 2025
Vermillion, SD
Bid Date: May 30 2025
Vermillion, SD
Bid Date: May 28 2025
Vermillion, SD
Bid Date: May 08 2025
Vermillion, SD
Bid Date: Apr 30 2025
Vermillion, SD
Bid Date: Apr 17 2025
Vermillion, SD
Bid Date: Apr 18 2025
Vermillion, SD
Bid Date: Mar 12 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
