Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 14, 2022 at 7:00 PM

Updated January 26, 2024

Site work, paving and outdoor lighting for a civil project in Shorewood, Wisconsin. Working plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and for outdoor lighting for a road / highway.

The Project includes the following Work: 1. Installation of: a. 1,700 linear feet (LF) of 48-inch (IN) relief sewer. b. 2,800 LF of 12-, 15-, 18-, 24-, and 30-IN combined sewer. c. 3,100 LF of water main. d. 4,100 LF of water services (private and public). 2. Addition of inlets, large diameter manholes, and two junction structures. 3. Replacement of: a. Lighting conduits and light poles. b. Road reconstruction with full curb and gutter. c. Curb ramps. The Bid must be accompanied by Bid security made payable to OWNER in an amount of 5% of the Bidder's maximum Bid price. The Village of Shorewood reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. For further requirements regarding Bid submittal, qualifications, procedures, and Contract Award, refer to the Instructions to Bidders that are included in the Bidding Documents.

Final Planning

Water / Sewer

$2,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

79

20

14

7

Subscribe For Documents

53 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
314
Active Projects
120
Bidding Soon
2,406
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2022

February 7, 2023

Project location map

Multiple Locations, Shorewood, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed