Site work and paving for a sidewalk / parking lot in Shorewood, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

1. Removal of approximately 1,100 square yards of pavement. 2. Installation of approximately 250 tons of asphaltic pavement. 3. Removal of approximately 120 tons of impacted material. 4. Addition of approximately 1,050 tons of aggregate base. 5. Replacement of approximately 550 linear feet of pavement markings. 6. Addition of approximately 90 square yards of native landscaping. The bid documents are those prepared by Strand Associates, Inc.(R), 126 North Jefferson Street, Suite 350, Milwaukee, WI 53202, and designated as "Police Department Parking Lot Reconstruction." The letting of Work is subject to the provisions of Section 66.0901 of the Wisconsin Statutes. The successful Bidder's failure to execute the Contract and furnish the Performance Bond within 10 days after the Award shall cause the Bid Bond or check to be forfeited to the Village as liquidated damages in accordance with Section 62.15(3) of the Wisconsin Statutes. A recommendation will be made to the Village Board at its meeting on March 7, 2022. Award will be made to the lowest and most responsible Bidder. The Village of Shorewood reserves the right to accept any bid most advantageous to the Village, waive any technicality, or reject any or all bids. No bid shall be withdrawn for a period of sixty (60) days after the Bid Opening date without the consent of the Village. Contractors MUST be Pre-Qualified prior to placing a bid in accordance with Section 00 45 13. TBU JOB No-3646.031 Project No: 160203 Contractor shall pay Owner $500.00 for each day that expires after the time specified in Paragraph 4.02 for each milestone or Substantial Completion until the work is Substantially Complete. After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining work within the Contract Time or any proper extension thereof granted by Owner, Contractor shall pay Owner $500.00 for each day that expires after the time

Award

Sidewalks / Parking Lot

$105,999.00

Public - City

Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
46
Bidding Soon
1,008
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2022

April 4, 2022

img_map_placeholder

4057 N Wilson Dr, Shorewood, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.