Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Milton, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
This project shall consist of: installation of a traffic control signal, roadway lighting, road-way widening, roadway grading, storm drainage, retaining walls, utility relocation, driveway recon-struction, curb and gutter, pedes-trian facilities, ADA curb ramps, channelization, signing, landscap-ing, and other work, all in accor-dance with. the attached Contract Plans, Contract Provisions, and the Standard Specifications. The City anticipates awarding this project to the successful bid-der and intends to give Notice to Proceed as soon as the Contract and all required documents are executed in full. Regardless of the date of award or Notice to Proceed, the Contractor must complete all work within 130 working days. QUESTIONS: Any questions must be directed to Ken Faucher, Public Works Administration Assistant, by email at kfauch-er@cityofinilton.net, or by letter addressed to same. Questions must be received by the City no later than 5:00 p.m. three busi-ness days preceding the bid open-ing to allow a written reply to reach all prospective Bidders before the submission of bids. OTHER PROVISIONS: All bids and this Project shall be governed by the Contract, as defined by the Washington State Department. of Transportation Standard Specifications for Road, Bridge, and Municipal Construction 2021 (Standard Specifications), which is incorpo-rated by this reference as though set forth in full. All bid proposals shall be in accordance with the Contract and all bid proposals shall be accompa-nied by a bid deposit or bond in the amount required in the Contract. ForliAture of the proposal bond or deposit to the City shall be in accordance with the Contract, The City, in accordance with Title VI of the Civil. Rights Act of 1964, 78 Stat.. 252, 42 11.S.C. 2000d to 2000d-4 and Title 49 C.F.R,, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-assisted programs of the Department of Transportation issued pursuant to such Act, here-by notifies all bidders that it will affirmatively ensure that in any contract. entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in. response to this invitation and will not be discriminated against on the grounds of race, color, nation-al origin, or sex in consideration for an award, The City encourages minority and women-owned firms to submit bids Consistent with the City's policy to ensure that such firms are afforded the maximum practicable opportunity to compete for and obtain public contracts. The City of Milton reserves the right; to reject any and all bids, waive any informalities or minor irregularities in the bidding, and determine which bid or bidder meets th.e criteria set forth in the bid documents.
Post-Bid
Roads / Highways
$600,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 1, 2022
January 5, 2023
Hwy 99 & Porter Way, Milton, WA
Related To This Project
Milton, WA
Bid Date: Apr 14 2022
Milton, WA
Bid Date: Jul 31 2023
Milton, WA
Bid Date: Aug 28 2023
Milton, WA
Bid Date: Jan 21 2022
Milton, WA
Bid Date: Apr 07 2021
Milton, WA
Bid Date: Jul 23 2024
Milton, WA
--
Milton, WA
Bid Date: Oct 21 2022
Seattle, WA
Bid Date: Nov 15 2022
Seattle, WA
Bid Date: Nov 30 2022
Seattle, WA
Bid Date: Dec 14 2022
Seattle, WA
Bid Date: Dec 15 2022
Seattle, WA
Bid Date: Nov 19 2022
Tacoma, WA
Bid Date: Nov 09 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.