BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 12, 2020 at 7:00 PM

Updated September 14, 2023

Site work for a bridge / tunnel in Myerstown, Pennsylvania. Completed plans call for site work for a bridge / tunnel.

The project includes, but is not limited to, demolition and removal of an existing 4' x 3'-6" (+/-) reinforced concrete box culvert with concrete headwalls; and replacement with a 66" x 51" polymer coated corrugated metal pipe arch culvert, including corrugated aluminum headwalls. The scope of work also includes guide rail replacement, pavement restoration, scour protection, stream bypass assembly, erosion and sediment pollution controls and other associated work. Each proposal must be accompanied by a certified check, bank cashier's check, trust company treasurer's check or bid bond (in the required form) for ten percent (10%) of the bid total. Jackson Township hereby reserves the right, which is understood and agreed to by all bidders, to reject any and all bids and to waive any omissions, errors, mistakes, defects or irregularities in any bid at its sole discretion. Questions shall be submitted via the "Questions" online. Prevailing wage rates and record-keeping procedures established by Pennsylvania Department of Labor & Industry shall apply for bids in excess of $100,000 Requests for clarification are due Monday, January 27, 2020 10:00:00 AM [(UTC-05:00) Eastern Time (US & Canada)].

Award

Bridges / Tunnels

$64,730.00

Public - City

Site Work

Subscribe For Documents

71 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
495
Active Projects
226
Bidding Soon
3,033
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2020

March 4, 2020

Project location map

W Main Ave, Myerstown, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.