BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and renovation of a mixed-use development in Longmont, Colorado. Conceptual plans call for the renovation of a transportation facility; for site work for a transportation facility; for paving for a transportation facility; and for outdoor lighting for a transportation facility.

Various improvements and maintenance of existing infrastructure at Vance Brand Airport are included in the 2012 Airport Master Plan. Past projects have included: asphalt and concrete ramp rehabilitation; taxiway connectors; runway maintenance; and rehabilitation of the airfield lighting system. In 2022, the state's aeronautics division agreed with the need to move a runway maintenance project up a year to perform minor maintenance and completely remark the entire runway with the FAA required runway markings in accordance with FAA standards to improve safety and visibility of the severely faded markings. Also, currently planned for 2023 is a new taxilane to the south side to facilitate continued expansion and development which will allow for the airport to be more self-sustaining by generating additional revenue through development. In 2025, there are two projects projected. The first is to joint seal and replace cement panels on the aircraft parking apron to prevent further damage to this needed infrastructure, which will save significant cost in the future. The second project is to rehabilitate the section of taxiway that leads from the east end of Taxiway A around in front of the Airport Manager's office and connects back into the northeast corner of the aircraft ramp. This project is included in the city's 2022-2026 Capital Improvement Plan (CIP) and funding is allotted for 2022, 2023 and 2025. As of March 18, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Transportation Terminals

$2,001,047.00

Public - City

Outdoor Lighting, Paving, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
83
Active Projects
38
Bidding Soon
942
All Active Projects
396
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2023

img_map_placeholder

229 Airport Rd, Longmont, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.