BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and renovation of a mixed-use development in Winston Salem, North Carolina. Completed plans call for the renovation of a playground / park / athletic field; for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and for outdoor lighting for a playground / park / athletic field.

Site & Amenities Construction for a 228.2 acre Park south of the William Roscoe Anderson Jr. Recreation Center at 2450 Reynolds Park Road. Pave 79 existing gravel parking spaces, pave existing granite path, new paved connection at Leight Street, custom mining/climbing playground, large shelters (40 x 80'), small pavilions, shade structures, new stair connection to overlook boom, shotcrete retaining/climbing walls, site furnishings, solar lighting and native shade trees. Two (2) new 3,200 square foot each under roof Large Shelters with built-in concrete benches to be A606- 4 (Corten) Weathering Steel panels & trusses. Three (3) sets of two (2) Small Pavilions 896 SF total each to be A606-4 (Corten) Weathering Steel panels & trusses. Two (2) Shade Structures 32' diameter each to be A606-4 (Corten) Weathering Steel panels & trusses with perforated metal roof. Playground Equipment and Surfacing. Playground tower 42' height (15x15'square) with 3 levels of composite decking & climbing elements plus covered observation deck. Tower frame to be hollow structural steel frame (10x10x 5/16). Climber frame to be 2 3/8" OD phosphate dipped steel tubing finished w/powder coat or hot dipped galvanized finish. Playground bridge connections (enclosed stainless steel cable mesh) with hollow structural steel frame (10x10x 5/16) supports & landings at (15 x15' square) and (8'-10" wide x 36' long). The scope of work includes, but is not limited to, the following: Structural Steel Framing, Fabrication and Roofing for Shelters Site work including Clearing & Grubbing, Demolition, Erosion Control and Grading Site Utilities (water, electrical) Underground Stormwater System Asphalt Paving Aggregate Base Course Paving Concrete Curbing Concrete Paving Shotcrete Retaining/Climbing Walls Permanent Seeding Landscaping and Mulching Solar Powered Roadway & Parking Lighting Concrete and Masonry Electrical Plumbing Minority and Women Business Enterprise goals apply: 8% MBE, 6% WBE For technical questions regarding this project, please submit questions in writing to Darren Redfield at darrenmr@cityofws.org for response to all by addendum. End of Question Period is 5:00 PM, December 30, 2020. The City reserves the right to waive any informalities in the bidding and to reject any or all proposals. Staff will be present to answer questions. Following this meeting, interested parties will drive to the project site to observe the existing conditions. A sign-in sheet will serve as the attendance record. Prime bidders and subcontractors are encouraged to attend to learn about the project scope and to discuss outreach efforts to HUB-certified M/WBE subcontractors. Two (2) new 3,200 square foot each under roof Large Shelters with built-in concrete benches to be A606- 4 (Corten) Weathering Steel panels & trusses. Three (3) sets of two (2) Small Pavilions 896 SF total each to be A606-4 (Corten) Weathering Steel panels & trusses.

Award

Playgrounds / Parks / Athletic Fields

$2,660,531.00

Public - City

Outdoor Lighting, Paving, Renovation, Site Work

85

11

8

4

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
217
Active Projects
132
Bidding Soon
1,941
All Active Projects
839
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

January 7, 2021

March 15, 2021

November 15, 2021

img_map_placeholder

2450 Reynolds Park Rd, Winston Salem, NC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.