BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in Boulder City, Nevada. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

https://www.foxcarolina.com/lake-mead-at-the-hoover-dam-to-reach-lowest-water-level-in-decades/article_58eb3757-37e9-560d-9cd7-e25df50d77bc.html A crippling drought in the western US is dropping the water level at Lake Mead and the Hoover Dam to a historically low level, putting pressure on the region's drinking water supply and the dam's electric capacity. By Thursday, Lake Mead's water level is expected to sink to the lowest it's been since it began filling during construction of the Hoover Dam, according to Bureau of Reclamation spokeswoman Patricia Aaron. "Lake Mead will most likely hit elevation 1,071.61 (feet) on Thursday, June 10. That will match the previous lowest elevation on record since the 1930s," Aaron said. Lake Mead and the Hoover Dam straddle the Arizona-Nevada state line along the Colorado River, about 35 miles southeast of Las Vegas. The river provides drinking water to Arizona, Nevada, and part of Mexico. The dam generates electricity for parts of Arizona, California and Nevada. While the lake's water level is expected to reach a new low this week, it won't be the bottom. "We anticipate the elevation of Lake Mead to continue to decline until November 2021," Aaron said. Parts of the West and the Intermountain West have been in near continual drought conditions for decades. The Intermountain West is the area between the Rocky Mountains and Cascade Mountains in the Pacific Northwest and the Sierra Nevada Mountains in California. "Some years are better than others and not in all places at all times, but the region has never fully recovered with enough rainfall and snowfall to erase the deficit," CNN meteorologist Brandon Miller said. Miller described the drought as a "vicious cycle" in which dry land leads to less evaporation, which leads to fewer clouds and more sun, which equals more heat and evaporation. "Climate change is clearly playing a role, as recent years have all been among the hottest in history. The warmer temperatures are driving that vicious cycle, and making it harder for normal or even above average rainfall years to make a dent in the drought," Miller said. "When one or two below average rainfall/snowfall years occur, as we have just seen, the results are disastrous." As the water in Lake Mead drops, so does the dam's electrical output. Hoover Dam usually produces about 2,074 megawatts, according to the Western Area Power Administration. That's about enough electricity for nearly 8 million people. Tuesday's capacity is 1,567 megawatts, a drop of about 25%. "Every foot of lake level decline means about 6 (megawatt) of lost capacity," Aaron said. With no relief in sight, officials are planning for another unprecedented declaration in August, which is when operating conditions are set for the following year. It's likely a Level 1 Shortage Condition will be declared for 2022 for Lake Mead, Aaron said, meaning surrounding states will have to implement water-saving measures. Arizona Department of Water Resources Director Tom Buschatzke said the planned drop in water coming from Lake Mead next year will be "painful," but the department is already working on contingency plans. "While we may have less water coming to Arizona from the Colorado River in 2022, Arizona's water managers and suppliers have been taking measures to prepare and will continue to work to ensure the river remains stable for generations to come," Buschatzke said. CNN has reached out to the Nevada Department of Conservation and Natural Resources about its planning for future water needs. _________ (i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued, except to facilitate the submission of electronic quotes through FedBizOpps. (ii) To facilitate electronic quote submissions through FedBizOpps, a request for quote (RFQ No. 140R3019Q0006) is being issued subsequent to this combined solicitation/synopsis. (iii) This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular number 2020-04, dated 01/15/2020. (iv) This requirement is a small business set-aside. The North American Industry Classification System (NAICS) Code for this acquisition is: 238120 with a small business standard of $15.0 million. (v) The Performance Work Statement provides more detailed information about the requirement and is attached to the RFQ. (All attachments may also be found at www.fedconnect.net, by searching for the RFQ number 140R3019Q0006, using the reference number search criteria, under "Search Public Opportunities Only"). (vi) The Bureau of Reclamation has a requirement for the modification and upgrade of existing fall protection on two existing water tanks. Information about the requirement and the Performance Work Statement is attached to the RFQ. (vii) Performance is anticipated begin on or before 04/01/2020. (viii) FAR provision 52.212-1, Instructions to Offerors - Commercial Items - addendum replaces the term "offer" with "quote" within the provision at 52.212-1. In addition to the requirements of the Instructions to Offerors - Competitive Acquisitions provision of this solicitation, each quoter shall submit a quote in accordance with the instructions contained in this provision. (A) General Quotation Instructions (1) Vendor will submit a firm-fixed price quote for Line items 00010-00050 on the Vendor Price Sheet and provide schedule showing completion of site work within 90 days of receipt of notice to proceed. All offers shall be broken down on the Vendors Pricing Spreadsheet and the lump sum must be on the SF-1449. (2) Quote will include all the costs to complete the requirements in the Performance Work Statement. (3) Quote shall include vendors local labor rates, which may be located at: wdol.gov (5) Submit the following information: Dun and Bradstreet Number Systems (DUNS): Contractor E-mail Address: (ix) Award will be based upon Best Value taking into consideration technical capability (ability to meet the requirements of the Statement of Work (SOW), and price. Technical capability is more important than price. Award will be made to the technically acceptable low quote. (xv) All questions shall be submitted via email to tlwirth@usbr.gov no later than Thursday, March 5, 2020, at 9:00 am, PST. Answers will be posted no later than Tuesday, March 10, 2020. Period of Performance: 04/01/2020 to 09/30/2020

Post-Bid

Water / Sewer

$400,000.00

Public - Federal

Renovation, Site Work

18

1

8

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
19
Bidding Soon
445
All Active Projects
217
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2020

April 1, 2020

img_map_placeholder

NV-172, Boulder City, NV


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.