BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2026 at 8:00 PM

Updated May 28, 2026

Site work and paving for a road / highway in Sedro Woolley, Washington. Working plans call for site work for a road / highway; and for paving for a road / highway.

SR 20 has been identified as a Crash Analysis Corridor. This project will install a series of compact roundabouts at Gardner Road, District Line Road, and Collins Road. Dual faced mountable curb will be installed between the roundabouts to restrict left-turn movements. The result will be fewer crashes with lower severity for motorists. NOTE: Total project cost includes Toll Credits. Length : 1.910 Agency: WSDOT - NW Begin Termini : SR 20 MP 61.32 End Termini : SR 20 MP 63.23 As of May 27, 2026, the project is in Final Planning status. Anticipated letting Year is 2026. WSDOT - SR 20/Burlington to Sedro-Woolley - Corridor Improvements *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Final Planning

Roads / Highways

$14,676,481.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
397
Active Projects
169
Bidding Soon
3,226
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 3, 2026

Project location map

WA-20, Sedro Woolley, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.