BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 5, 2025 at 7:00 PM

Updated March 6, 2025

Site work and paving for a mixed-use development in Sedro Woolley, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The City of Sedro-Woolley, Washington, is soliciting interest from consulting firms with expertise in civil engineering, surveying, right-of-way services, permitting including NEPA, construction management and other related professional services. Project scope includes30%, 60%, 90%, 100%PS&E for design of roadway/multi-modal facilities, street lighting, storm drainage, right-of-way acquisition, permitting, adherence to FHWA federal funding requirements, WSDOT and APWA design standards. The SR20 Cascade Trail Phase2A Project runs parallel to the north side of SR 20and extends from Hodgin Street to Holt camp Road. There is a 0% DBE Goal assigned to this project for design, 10% SBE voluntary goal. Each proposal will be reviewed and evaluated by personnel from the City of Sedro-Woolley and the most qualified candidate will be offered a negotiated hourly rate contract for design and the City reserves the right to retain the selected firm for any subsequent phases (RW, CN) associated with the project as required. Submit a single digital copy, in PDF format, on or before the due date to William Bullock, Director of Public Works,bbullock@sedro-woolley.gov. No fax submissions accepted. Questions maybe addressed to William Bullock (360) 855-0771. The City of Sedro-Woolley reserves the right to amend the terms of this Request for Qualifications to circulate various addenda, or to withdraw the RFQ at any time, regardless of how much time and effort consultants have spent on their responses. All prospective consultants must be advised that federally funded projects will be held to Federal Equal Employment Opportunity(EEO), ADA and Title VI requirements. The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$795,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
119
Bidding Soon
2,745
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

Project location map

State Rte 20 & Cascade Trail, Sedro Woolley, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.