Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 21, 2025 at 8:00 PM
Updated August 22, 2025
Site work, paving and outdoor lighting for a mixed-use development in Sedro Woolley, Washington. Working plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
As of August 21, 2025, this project is in design development. A general contractor has been selected. Construction is expected to start April 2026. *Previous solicitation listed below for reference:* The City is seeking professional engineering and technical services for design, right-of-way, and potentially, construction management of required street, multi-modal, storm drainage, rail grade excavation, and other improvements on an existing unopened/unimproved right-of-way alignment between Street and Sapp Road. Project elements include: o Roadway design for a Complete Streets standard to include subgrade, HMA, shared-use path, and sidewalk improvements. o Unsignalized intersection improvements. o Stormwater improvements. o Excavation of remaining RR grade o Street lighting o Right of way acquisition as required. Design Services will include: o Preparation and submittal of intermediate (30%, 60%, 90%) and final design documents including drawings, specifications, and detailed cost estimates. o Coordinate required BNSF review and approvals. o Relevant analysis, studies, and reports. o Survey services for design. o Preparation of permit-related documentation as required by regulatory agencies. o Right of way services, if required. o Assistance in bidding and selection of construction contractor. o Construction phase engineering support (post-design services). o Full construction management services, if required. The schedule that has been proposed by the City includes starting the preliminary engineering design and permitting in March of 2025, completing final design and permitting in December 2025; construction anticipated in April/May of 2026. The method of Contractor Selection has not been Determined at this time.
Pre-Construction/Negotiated
Roads / Highways
$2,329,741.00
Public - City
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2026
Multiple Locations, Sedro Woolley, WA
Related To This Project
Sedro Woolley, WA
Bid Date: Feb 11 2025
Sedro Woolley, WA
Bid Date: Feb 11 2025
Sedro Woolley, WA
--
Sedro Woolley, WA
Bid Date: Mar 28 2025
Sedro Woolley, WA
--
Sedro Woolley, WA
Bid Date: Feb 27 2025
Sedro Woolley, WA
Bid Date: Feb 25 2025
Sedro Woolley, WA
--
Sedro Woolley, WA
Bid Date: May 22 2019
Sedro Woolley, WA
Bid Date: Nov 26 2024
Sedro Woolley, WA
Bid Date: Oct 23 2024
Sedro Woolley, WA
Bid Date: Oct 03 2024
Sedro Woolley, WA
--
Sedro Woolley, WA
--
Sedro Woolley, WA
Bid Date: Aug 15 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
