BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 12, 2025

Site work and new construction of an educational facility in Palm Springs, California. Completed plans call educational facility; and for the construction of a 175,000-square-foot, two-story above grade educational facility.

As of December 27, 2024, rebid of Bid Package #17. Construction is under way and completion expected March 31, 2027. Bid Packages #01 – 03 are all set and Bid Packages #04 – #26 (except #17) received approval from the December 20, 2024, School Board Meeting. Site improvements and four new buildings for increment 2/3 are as follows: the accelerator building consists of a 2-story academic building and the approximate gsf of the building totals 90,435 sf. The culinary building consists of a single-story culinary arts academic building, and the approximate gsf of the building totals 38,005 gsf. The event center building consists of a 1 story event venue, and the approximate gsf of the building totals 24,482 gsf. The campus support building consists of a 1 story maintenance & operations building, service yard and central utility plant, and the approximate gsf of the occupied building space totals 14,215 sf. The site scope of work includes: site preparation, grading & drainage, stormwater management, new utility services to campus buildings, fire access plans, onsite improvements, and frontage (offsite) improvements. Please note that onsite rough grading and a portion of underground utilities were previously bid out for increment 1. Question Deadline 09/22/2023 *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. PN - 43-98W-0500-PDSP-BUILDING Question Deadline 09/25/2024 at 5:00 PM PT The District will not respond to any bidder inquiries or clarification requests, unless such inquiries or clarification requests are submitted timely to: C.W. Driver Project Manager, Jonathan Keene at jkeene@cwdriver.com

Post-Bid

Educational

$275,000,000.00

Public - City

LEED Certification, New Construction, Site Work

1856

40

580

7

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
119
Bidding Soon
1,771
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 4, 2025

June 10, 2025

Project location map

2363 E Tahquitz Canyon Way, Palm Springs, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.