BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2021 at 8:00 PM

Updated September 14, 2023

Renovation of a municipal facility in Winnipeg, Manitoba. Completed plans call for the renovation of a municipal facility.

The project scope includes the replacement of 3 fire alarm panels, one annunciator panel and a majority of the buildings initiating and signaling devices. The system will be brought up to current building and accessibility codes by relocating all manual pull stations to the appropriate height and adding some new devices in the kitchen area as well as in the vicinity of the roof access hatch area. The project will include all interlocks with ancillary equipment such as the building HVAC, door shutters, and monitoring company dial out equipment. The new system is to be a fully addressable. The scope will include all electrical power requirements including installation of conduit, wiring and termination into electrical panels. Any structural requirements such as wall backing to support new panels, are included within the scope. Firestopping of wall/floor penetrations are included. In an attempt to minimize disruption, the new panels will be installed alongside existing panels first. Once the new system is installed and commissioned, the existing system will then be demolished. See attachments 3 for project's drawings 66% completion for information only and not for bidding purposes. Documents are available at: https://www.bgis.merx.com/

Post-Bid

Municipal

$300,000.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
44
Bidding Soon
536
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2020

October 29, 2021

Project location map

1700 Inkster Blvd, Winnipeg, MB


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.