Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 14, 2020 at 8:00 PM
Updated June 16, 2026
Renovation of a municipal facility in Winnipeg, Manitoba. Completed plans call for the renovation of a municipal facility.
GOC1824267: This project involves softly excavating an approximate 1.5 m section of vertical pipe, removing existing heat trace and insulation and installing a small section of 37 mm copper piping with new inline heat trace and pipe insulation on an existing water line at the Freshwater Institute. The heat trace and insulation are to extend the full vertical length below grade. This work will require soft dig methods. Also involved is the installation of new board insulation above the existing underground line from the Water Treatment Facility to the Warehouse. The project also includes the decommissioning of an existing irrigation line. Scope includes removing small sections of piping at the location of the sprinkler head as well as in the ceiling space of the administration building where the line exits the building and capping both ends. Backfilling and laying of new sod is required. GOC1824270: Work of this Contract involves replacing an existing 200 mm water shut-off valve located in the boulevard of the University Crescent serving the Freshwater Institute. Traffic Control, Excavation, Valve installation, Backfilling and Laying of Sod are to be in accordance with the City of Winnipeg Standard Construction Specifications Documents are available at: https://www.bgis.merx.com/ Owner does not release Bid Results. Project will be updated once Awarded Contractor details are announced.
Post-Bid
Municipal
$200,000.00
Public - Federal
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2020
June 15, 2020
501 University Crescent, Winnipeg, MB
Related To This Project
Winnipeg, MB
--
Winnipeg, MB
--
Winnipeg, MB
Bid Date: Dec 10 2020
Winnipeg, MB
Bid Date: Aug 24 2020
Winnipeg, MB
Bid Date: Jun 11 2021
Winnipeg, MB
Bid Date: Jul 22 2021
Winnipeg, MB
Bid Date: Jun 11 2021
Winnipeg, MB
Bid Date: Oct 22 2021
Winnipeg, MB
Bid Date: Aug 25 2021
Winnipeg, MB
Bid Date: Nov 08 2021
Winnipeg, MB
Bid Date: Sep 15 2021
Winnipeg, MB
Bid Date: Feb 09 2021
Winnipeg, MB
Bid Date: May 13 2021
Winnipeg, MB
Bid Date: Mar 25 2021
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
