BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2020 at 8:00 PM

Updated June 16, 2026

Renovation of a municipal facility in Winnipeg, Manitoba. Completed plans call for the renovation of a municipal facility.

The primary intent of the contract is to demolish an existing two-deck multi-zone air handling unit (AHU) located in the Small Craft Harbour Building (SCHB) mechanical mezzanine and replace it with a new built-up AHU and nine (9) variable air volume (VAV) boxes complete with electric heating coils. The secondary intent of this project is to replace five existing exhaust fans in the SCHB and nearby Solar Warehouse, along with associated components and controls with new. The Contractor is to provide a fully operational and code compliant heating, ventilation, and air-conditioning (HVAC) system for the facility. The scope of work includes but is not limited to: - Demolition of an existing multizone AHU, associated piping, and controls. - Demolition of an existing steam humidifier. - Replacement of existing steam control valves and traps. - Replacement of an existing two-way chilled water control valve for the SCHB AHU with a new three-way control valve. - Supply and installation of a new built-up AHU with steam heating coil and chilled water cooling coil, variable frequency drives (VFD), associated piping, and controls. - Supply and installation of nine (9) new VAV boxes with electric heating coils and associated controls. - Modifications to existing ductwork to accommodate new AHU and VAVs. - Supply and installation of new perimeter electric baseboard heaters and associated controls. - Replacement of three (3) exhaust fans in the SCHB. - Provide new exterior wall opening in the SCHB and install a new intake louver, motorized damper, and associated controls. - Replacement of two (2) existing exhaust fans in the Solar Warehouse. - Provide all necessary wiring, conduit, and electrical components to connect to new HVAC equipment. - Provide new electronic thermostats throughout the SCHB and Solar Warehouse and connect to new and existing HVAC equipment. - Integration of the controls for the new air handling unit, VAV boxes, baseboard heaters, and exhaust fans with the existing building automation system (BAS). Supply and install a new Honeywell network controller, equipment controllers, and all other control components as specified. Provide all programming and graphics required for the new equipment and controls. Documents are available at: https://www.bgis.merx.com/ Owner does not release Bid Results. Project will be updated once Awarded Contractor details are announced.

Award

Municipal

$274,500.00

Public - Federal

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
102
Bidding Soon
699
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 22, 2020

July 23, 2020

Project location map

501 University Crescent, Winnipeg, MB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.