Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2020 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Orem, Utah. Completed plans call for the renovation of a educational facility.

Access controls & ADA hardware upgrades on various buildings. The base bid will include all work and materials associated with the project as outlined in the plans and specs for the UVU BA "Browning Administration" - building. A bid bond in the amount of five percent (5%) of the bid amount, made payable to the Division of Facilities Construction and Management on the AIA Document A310 - 2010 Bid Bond, or equivalent, shall accompany the bid submission and in U3P. If the bid bond is not uploaded with the bid through U3P, the bid is NONRESPONSIVE. Questions deadline Thursday, May 28, 2020 3:00 PM

Bid Results

Educational

$197,629.00

Public - State/Provincial

Renovation

15

14

18

4

Subscribe For Documents

190 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
70
Bidding Soon
1,212
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 8, 2020

July 8, 2020

Project location map

800 W University Pkwy, Orem, UT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed