Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 17, 2025 at 8:00 PM
Updated July 18, 2025
Demolition, site work, paving and new construction of a bridge / tunnel in Campo, California. Conceptual plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for paving for a bridge / tunnel.
Update: Widen the bridge on Buckman Springs Road over Cottonwood Creek. Project is included San Diego County Fiscal Year 2025-2029 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Update:https://www.sandiegocounty.gov/content/dam/sdc/dpw/ENGINEERING_SERVICES/5-Year/CIP%20Capital%20Improvement%20Plan%202024-25%20to%202028-29.pdf Widen the bridge on Buckman Springs Road over Cottonwood Creek. Project is included San Diego County Fiscal Year 2025-2029 Page no 26 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE: https://www.sandiegocounty.gov/content/dam/sdc/dpw/CIP%20Capital%20Improvement%20Plan%202023-24%20to%202027-28.pdf Widen the bridge on Buckman Springs Road over Cottonwood Creek. Project is in San Diego County capital budget fy 2023-2028 CIP 58 _________________________________________________________________________________________________________________________ This project will widen the bridge on Buckman Springs Road over Cottonwood Creek. This project was requested to meet federal bridge safety requirements. This project is included in the San Diego County's FY 2021-2025 Capital Improvement Plan (CIP). As of March 15, 2022, information regarding a design team and a general contractor is not available Construction is anticipated from FY 2022 to FY 2024.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$10,937,500.00
Public - County
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
