BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a water / sewer project in Hilton Head Island, South Carolina. Working plans call for site work for a water / sewer project.

PROPOSED WORK: The proposed work consists of performing maintenance dredging of the entrance channel to the Windmill Harbour Marina. The Windmill Harbour Marina is a lock-harbor facility with an entrance channel that is approximately 60 x 350. Since the lock/harbors construction in 1985, dredging has not been required within the entrance channel. In detail, the applicant is requesting authorization for a ten-year maintenance dredging permit to mechanically dredge the channel to a depth of -8.0 feet MLW with an allowable 1 overdepth. The approximate dimensions of the proposed dredge area are 40 x 350. The anticipated volume of material to be dredged is approximately 2,400 cubic yards for the initial dredge event. Anticipated dredge volumes for future dredge events are unknown, however, the applicant anticipates future events would not exceed 1,500 cubic yards of material to be dredged. The material will be dredged mechanically with placement into a small scow or onto a specially designed barge with containers to hold the dredged material. The scow/ barge will then be transported to the nearby C.C. Haigh, Jr. boat landing, which is approximately one mile from the marina. At the boat landing, the sediment will be offloaded into dump trucks that will then dispose of the dredged material at a private upland pit owned by Cleland Site Prep, Inc (Latitude: 32.2272 , Longitude: -80.9553 ). As of July 22 2020, this project is with the city for permit review. Information regarding the selection of a general contractor and construction timeline has not been confirmed, but construction isn't expected to occur until Winter 2021-2022.

Final Planning

Water / Sewer

$500,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
42
Bidding Soon
520
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 1, 2021

img_map_placeholder

161 Harbour Psge, Hilton Head Island, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.