Demolition, site work, renovation and addition to a water / sewer project in West Palm Beach, Florida. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project Description: Project includes but is not limited to the construction of three (3) new STA cells, a 6-mile concrete lined connection canal, perimeter and interior levees, canals, structures, culverts, boat ramps, maintenance ramps, and all other associated appurtenances shown or referenced within the Contract Documents referenced herein. Structures include one (1) fixed divide weir to balance flows among the cells and eleven (11) control structures to regulate flows within the STA treatment cells. Inflow and outflow control structures are double barrel reinforced concrete box culverts with slide gates, control buildings, platform mounted stilling wells, and include electrical and remotely operated telemetric control. Project also includes construction of Florida Power & Light (FPL) tower pads and access ramps at all FPL transmission poles and installation of FPL Distribution. Directions: From North and South: From I-95 or Florida Turnpike, turn west onto Southern Boulevard, then turn left onto E. Canal Street South (CR880). Follow CR 880 for about 4-miles to the vicinity of structure G-341, then left (South) onto a dirt road (levee) for about 5.5-miles to the vicinity of pump station G-310. The site begins just west of the G-310 pump station and continues for 6-miles south just west of the L-7 levee for the project connection canal, and then another 3-miles south to the S-6 pump station for the STA area which lies between the L-7 and L-15 levees. Call 786-255-2527 for driving directions ONLY. Dollar Range: $96,180,800.00 - $106,305,100.00 Contract Time: 655 Days to Substantial Completion Contract Time: 745 Days to Final Completion Liquidated Damages: $4,500.00 per day, Substantial Completion Liquidated Damages: $2,400.00 per day, Final Completion Liquidated Damages: Pursuant to FDEP Consent Order $1,000.00 per day beyond December 31, 2022 SBE Requirements: 25% Utilization INQUIRY PERIOD: The inquiry period ends June 30, 2020 @ 5:00 p.m INQUIRY PERIOD: The Inquiry period has been extended to July 27, 2020. No questions will be accepted after this date

Award

Water / Sewer

$96,800,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

204

23

183

8

Subscribe For Documents

113 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
276
Active Projects
134
Bidding Soon
1,935
All Active Projects
818
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 4, 2020

October 5, 2020

January 20, 2023

img_map_placeholder

To Be Determined, West Palm Beach, FL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.