BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 15, 2021 at 7:00 PM

Updated March 13, 2025

Site work and renovation of a civil project in Benton, Pennsylvania. Completed plans call for site work for a water / sewer project.

**The project was awarded to the following bidder - George J. Hayden, Inc dba Hayden Power Group $227,500.00 - PSI Pumping Solutions, Inc. $1,379,800.00 The total awarded amount is $1,607,300.00.** Clarification Deadline: 8/21/2020 4:00 PM The Project includes the following Work: Prepare, sandblast, and paint existing equalization tank, two process treatment and digestion trains, effluent box, miscellaneous metals and metal repairs, bypass pumping (as required) in-kind replacement of equalization pumps/controls, sludge pumps/controls, process piping, clarifier drives, cathodic protection, miscellaneous equipment, new process blowers, RAS/WAS blower and air piping, new field instrumentation, remote pump station mechanical work, electrical wiring, conduits, and controls and coordination with Owner's SCADA integrator, erosion and sediment controls, and selective demolition. The Authority is awaiting grant award notification for the project. Construction is anticipated for the Spring and Summer of 2021. For all further requirements regarding bid submittal, bid security, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Attention is called to the fact that Davis Bacon wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012. Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States. The Benton Municipal Water and Sewer Authority hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received. Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date.

Award

Water / Sewer

$1,607,300.00

Public - City

Renovation, Site Work

23

2

25

9

Subscribe For Documents

150 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
246
Active Projects
119
Bidding Soon
1,239
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2020

October 12, 2020

Project location map

1 3rd St, Benton, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.