Site work and new construction of a water / sewer project in Union City, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

As of February 2 the project is anticipated to be awarded by middle of March.. Furnishing all labor, materials,equipment, and services for the construction of improvements designated as:Standby Power Generation System Upgrade Project.The project consists of new civil, mechanical,architectural, structural, HVAC, electrical,and instrumentation improvements and modifications to existing facilities. To accomplish this work, the Contractor shall complete the work items indicated on the Contract Documents, including, but not limited to the following:Procurement and installation of three new 12kv rated 2.5-MW standby engine generators, standby power distribution and paralleling switchgear, generator control panels, motor control center (MCC)/power panels, programmable logic controllers (PLCs),and other appurtenances.Construction of a new prefabricated metal building sized to house three new standby engine generators and associated electrical equipment, with room for one future standby engine generator.Construction of exterior pad-mounted transformers, an aboveground diesel fuel storage tank, day fuel tanks, and fueling system.Replacement of Substation No. 2 and MCCs.Installation of new electrical duct banks.Demolition of existing structures, generators, fuel tanks, control panels,switchgear, PLCs, MCCs, and other electrical/instrumentation equipment.Work shall be completed in accordance with all the requirements of the Contract Documents. Engineer's Estimated Cost:$26,000,000 MBE Goal Percentage: 25.6% WBE Goal Percentage: 6.9% Project Duration:760 Calendar Days Bid Bond Percentage:10% Questions concerning this project should be directed to:Union Sanitary District Attn: Kevin Chun 5072 Benson Road Union City, CA 94587 Phone: 510-477-7608

Bid Results

Water / Sewer

$20,680,320.00

Public - City

New Construction, Site Work

167

81

48

13

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
133
Active Projects
51
Bidding Soon
1,751
All Active Projects
747
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 16, 2021

February 14, 2022

img_map_placeholder

5072 Benson Rd, Union City, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.