Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 2, 2025 at 8:00 PM
Updated July 22, 2025
Site work and paving for a civil project in St Catharines, Ontario. Working plans call for site work for a bridge / tunnel; for paving for a road / highway; and water / sewer project.
The QEW Garden City Skyway - Bridge Twinning project includes constructing a new 2.2-kilometre twin bridge to the north of the existing bridge, connecting St. Catharines and Niagara-on-the-Lake. The existing Garden City Skyway (GCS) carries the Queen Elizabeth Way (QEW) over the Welland Canal at the boundary between St. Catharines and Niagara-on-the-Lake. The existing QEW GCS is a 48-span, high-level bridge that is 2.2 km long, 28 m wide and at the highest point over the Welland Canal, the bridge is approximately 40 m high. This bridge provides a strategic transportation and economic trade link between Canada and the Eastern Seaboard of the United States. Approximately 100,000 vehicles per day move across the QEW Garden City Skyway Bridge. TIMELINE: June 12, 2025, Infrastructure Ontario (IO) and the Ontario Ministry of Transportation (MTO) have selected Skyway Bridging Partners as the development partner for the QEW Garden City Skyway - Bridge Twinning Project. Skyway Bridging Partners has signed a Development Phase Agreement (DPA) with IO and MTO, under a Progressive Design-Build model. The DPA phase is a period during which IO, MTO, and Skyway Bridging Partners, as the development partner, work together to progress the design, risk, cost and schedule for the Project. The DPA phase is anticipated to take approximately 19 months; once completed, IO and MTO will have the option to enter into a contract for the construction of the new bridge with Skyway Bridging Partners. Further update spring/summer 2026. The Skyway Bridging Partners team includes: - Applicant Lead: Flatiron Dragados Canada Inc., Construction Demathieu & Bard Inc., Green Infrastructure Partners Inc. - Primary Design Team: Arcadis Professional Services (Canada) Inc., GHD Ltd. - Construction Team: Flatiron Dragados Canada Inc., Construction Demathieu & Bard Inc., Green Infrastructure Partners Inc.
Pre-Construction/Negotiated
Bridges / Tunnels
$450,000,000.00
Public - State/Provincial
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
9
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 20, 2024
January 1, 2027
Multiple Locations, St Catharines, ON
Related To This Project
St Catharines, ON
Bid Date: Mar 02 2023
St Catharines, ON
Bid Date: Jan 20 2022
St Catharines, ON
Bid Date: Apr 14 2022
St Catharines, ON
Bid Date: Apr 19 2022
St Catharines, ON
Bid Date: Dec 13 2021
St Catharines, ON
Bid Date: Feb 22 2022
St Catharines, ON
Bid Date: Aug 30 2022
St Catharines, ON
--
St Catharines, ON
Bid Date: Jan 09 2023
St Catharines, ON
Bid Date: Jan 12 2023
St Catharines, ON
--
St Catharines, ON
--
St Catharines, ON
Bid Date: Dec 20 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
