Site work and paving for a civil project in St Catharines, Ontario. Completed plans call for site work for a bridge / tunnel; for paving for a road / highway; and water / sewer project.

Infrastructure Ontario (IO) and the Ministry of Transportation (MTO) have released a Request for Proposals (RFP) for the QEW Garden City Skyway – Bridge Twinning project in the Regional Municipality of Niagara. The QEW Garden City Skyway – Bridge Twinning project includes constructing a new 2.2-kilometre twin bridge to the north of the existing bridge, connecting St. Catharines and Niagara-on-the-Lake. Five teams have been pre-qualified and invited to bid on the project, which is being delivered using a Progressive Design-Build – Target Price delivery model. Teams were selected based on criteria identified in the Request for Qualifications process that began in December 2022. The following teams and their prime team members were invited to respond to the RFP: AtkinsRéalis Major Projects Inc. Applicant Lead: AtkinsRéalis Major Projects Inc. Design Team: AtkinsRéalis Canada Inc., Hatch Ltd. Construction Team: AtkinsRéalis Major Projects Inc. Garden City Connectors Applicant Lead: Aecon Infrastructure Management Inc., Sacyr Canada Inc. (DBJV) Design Team: Parsons Corporation Construction Team: Aecon Infrastructure Management Inc., Sacyr Canada Inc. Garden City Link Applicant Lead: Acciona Infrastructure Canada, Inc., Amico Major Projects Inc., Pomerleau, Inc. (Integrated JV) Design Team: WSP Canada Inc. Construction Team: Acciona Infrastructure Canada, Inc., Amico Major Projects Inc., Pomerleau, Inc. Peter Kiewit Sons ULC Applicant Lead: Peter Kiewit Sons ULC Design Team: Kiewit Engineering Group Canada ULC Construction Team: Peter Kiewit Sons ULC Skyway Bridging Partners Applicant Lead: Dragados Canada Inc., Construction Demathieu & Bard Techno, Green Infrastructure Partners Design Team: Arcadis Professional Services (Canada) Inc., GHD Ltd., Pedelta Construction Team: Dragados Canada Inc., Construction Demathieu & Bard Techno, Green Infrastructure Partners See also Alberta doubles funding for capital maintenance and renewal Teams will begin preparing proposals that detail how they will deliver this project. Proposals will be evaluated by IO and MTO and the top-ranked team will work collaboratively with IO and MTO during a Development Phase, expected to start in Spring 2025. Once the Development Phase is completed, IO and MTO will have the option to sign a construction contract with the successful team. “With Ontario’s population growing at a historic rate, we need to ensure our transportation infrastructure keeps pace,” said Prabmeet Sarkaria, Minister of Transportation. “The new and expanded Garden City Skyway will be a game-changer, meaning less congestion and faster travel for the people of St. Catharines and Niagara Region.” The Skyway expansion includes construction of a new four-lane, 2.2-kilometre bridge across the Welland Canal, as well as the rehabilitation and full deck replacement of the current bridge. Once complete, each bridge will have four lanes with the new bridge carrying Toronto-bound traffic and the upgraded existing bridge carrying Niagara-bound traffic. “The Request for Proposals (RFP) is an important step on the path to expanding the Garden City Skyway. With the projected increases in population and jobs throughout the Greater Golden Horseshoe in the coming years, this expansion will allow people and goods to travel more freely through Niagara,” said Mat Siscoe, Mayor of St. Catharines. “The City of St. Catharines is looking forward to the completion of this project and the economic growth that will accompany it.” On average, 106,000 vehicles cross the Garden City Skyway bridge daily. “Ontario’s highway infrastructure is critical to the growth and economic prosperity of our province. As part of our plan to build Ontario, our government is continuing to invest in essential infrastructure like the Garden City Skyway to make it easier for people to travel, while supporting businesses that rely on Ontario’s highways and bridges to deliver goods,” said Kinga Surma, Minister of Infrastructure. See also Industry calls for clean energy focused stimulus Featured image: Prabmeet Sarkaria, Ontario Minister of Transportation announces the request for proposals have been issued for the QEW Garden City Skyway – Bridge Twinning project, on April 5, 2024. (Government of Ontario) ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The existing Garden City Skyway (GCS) carries the Queen Elizabeth Way (QEW) over the Welland Canal at the boundary between St. Catharines and Niagara-on-the-Lake. The existing QEW GCS is a 48-span, high-level bridge that is 2.2 km long, 28 m wide and at the highest point over the Welland Canal, the bridge is approximately 40 m high. This bridge provides a strategic transportation and economic trade link between Canada and the Eastern Seaboard of the United States. Approximately 100,000 vehicles per day move across the QEW Garden City Skyway Bridge. The Province has approved plans for the construction of a new twin QEW Garden City Skyway bridge to the north of the existing bridge. Objectives of the the Project: - The project will meet the infrastructure needs of the region and support the Growth Plan for the Greater Golden Horseshoe for the QEW. - Construct a new twin bridge structure for westbound traffic north of the existing GCS bridge. - Once completed, the twinned structure will temporarily receive all QEW traffic from both direction of travel while the existing bridge receives rehabilitation to extend its service life. - Ensuring roadway elements meet current standards * April 5, 2024 Infrastructure Ontario (IO) and the Ministry of Transportation (MTO) have released a Request for Proposals (RFP) for the QEW Garden City Skyway - Bridge Twinning project in the Regional Municipality of Niagara. The QEW Garden City Skyway - Bridge Twinning project includes constructing a new 2.2-kilometre twin bridge to the north of the existing bridge, connecting St. Catharines and Niagara-on-the-Lake. Five teams have been pre-qualified and invited to bid on the project, which is being delivered using a Progressive Design-Build - Target Price delivery model. Teams were selected based on criteria identified in the Request for Qualifications process that began in December 2022. AtkinsRealisMajor Projects Inc. - Applicant Lead: AtkinsRealis Major Projects Inc. - Design Team: AtkinsRealis Canada Inc., Hatch Ltd. - Construction Team: AtkinsRealis Major Projects Inc. Garden City Connectors - Applicant Lead: Aecon Infrastructure Management Inc., Sacyr Canada Inc. (DBJV) - Design Team: Parsons Corporation - Construction Team: Aecon Infrastructure Management Inc., Sacyr Canada Inc. Garden City Link - Applicant Lead: Acciona Infrastructure Canada, Inc., Amico Major Projects Inc., Pomerleau, Inc. (Integrated JV) - Design Team: WSP Canada Inc. - Construction Team: Acciona Infrastructure Canada, Inc., Amico Major Projects Inc., Pomerleau, Inc. Peter Kiewit Sons ULC - Applicant Lead: Peter Kiewit Sons ULC - Design Team: Kiewit Engineering Group Canada ULC - Construction Team: Peter Kiewit Sons ULC Skyway Bridging Partners - Applicant Lead: Dragados Canada Inc., Construction Demathieu & Bard Techno, Green Infrastructure Partners - Design Team: Arcadis Professional Services (Canada) Inc., GHD Ltd., Pedelta - Construction Team: Dragados Canada Inc., Construction Demathieu & Bard Techno, Green Infrastructure Partners Teams will begin preparing proposals that detail how they will deliver this project. Proposals will be evaluated by IO and MTO and the top-ranked team will work collaboratively with IO and MTO during a Development Phase, expected to start in Spring 2025. Once the Development Phase is completed, IO and MTO will have the option to sign a construction contract with the successful team.

Post-Bid

Bridges / Tunnels

$450,000,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
112
Bidding Soon
2,491
All Active Projects
1,004
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2023

April 1, 2025

img_map_placeholder

Multiple Locations, St Catharines, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.