BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Whitehall, Ohio. Completed plans call for site work for a water / sewer project.

This Project is estimated between $250,000 and $500,000 Project Description: The work includes cleaning and television inspection of the sanitary sewer system DSCC wide and incidental related work. The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with specifications & drawings #7-729, 6 sheets. Rehabilitate sewer pipelines by Cured-in-Place Pipe (CIPP) liners for vitrified clay (VCP), PVC pipe lines, and concrete pipes (RCP). The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with specifications & drawings #7-729, 6 sheets. Provide a continuous and tight-fitting liner throughout the entire length of the original pipe. Extend the CIPP the full length of the original pipe, from entry point to exit point, and provide a structurally sound and water-tight new pipe within a pipe. Cleanup, restore existing surface conditions and structures, and repair portions of the CIPP system determined to be defective. Conduct installation operations and schedule cleanup in a manner to minimize obstruction and inconvenience to traffic, pedestrians, and tenants. Location: The work is located at the DSCC, Columbus, Ohio. The approximate location is shown on the drawings. (X) 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995), ALT I (FEB 1995) - FAR (a) The clauses at FAR 52.236-2, Differing Site Conditions, and FAR 52.236-3, Site Investigations and Conditions affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed. (c) All interested offerors that want to attend the site visit need to register 4 days prior to site visit by e-mailing John.Patrick@dla.mil, William.Hurley@dla.mil and Matthew.Foreman@dla.mil Masks are required in the Visitor Processing Center (Pass and ID). See BASE ACCESS PROCEDURES for driving through the gate. (d) Visitor passes may only be issued for up to one week now. Not two weeks like it used to be. This would not be a change for one-day pre-bid site visits. BASE ACCESS PROCEDURES: To mitigate and lower the possible spread of COVID-19, Defense Supply Center Columbus base access procedures have been modified. Anyone entering the installation must maintain a protective barrier between themselves and the officer at the access control gate. Upon approaching the gate, drivers will stop and lower their window only 1-2 inches or enough to communicate with the officer and place Common Access Cards against the window with the barcode facing the officer. Once the barcode has been scanned, flip the CAC over so the officer can verify your photo. Once verified, you may proceed through the gate. In cases of tinted windows, you may be asked to lower the window enough to display the CAC. The new base access procedure will remain in effect until further notice. For questions, contact Security & Emergency Services at 614-692-5907. PASS & ID PROCEDURAL CHANGES: Masks are required when entering the Pass and ID Office, Bldg 61. In order to concentrate efforts to make servicing DSCC personnel our number one priority, and to better ensure the health and safety of our Pass & ID personnel, we are no longer using the RAPIDS Appointment Scheduler or taking walk-ins for Pass & ID services. DSCC personnel requiring these services should call 614-692-3023 and identify themselves as working on DSCC to schedule an appointment. All Questions are due 10 August, 2020 at 1:00pm EST. They need to be sent to the Contracting Officer in an e-mail before that date and time. Contracting Officer's e-mail is: William.Hurley@DLA.MIL The period of performance for this project is 180 calendar days after the issuance of the Notice to Proceed. The contractor shall furnish all plant, labor, equipment, materials, supplies, testing and supervision required in performing all operations in conjunction with this project in strict accordance with the specifications (CSC-19731 M&R Sanitary Lines Site Wide) , contract drawing No. 7-729 (6 sheets), complete and subject to the terms and provisions of this contract. Contractor shall perform the following work to complete this project.

Post-Bid

Water / Sewer

$500,000.00

Public - Federal

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
45
Bidding Soon
974
All Active Projects
418
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2020

September 30, 2020

img_map_placeholder

3990 E Broad St, Whitehall, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.