Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a water / sewer project in Auburn, Washington. Conceptual plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The pumps at Game Farm Wilderness Park are in need of replacement, and the building need repairs. This project was identified in the 2015 Comprehensive Plan as occurring in the short to mid term, or by 2025. Installation of new water main crossing the White River to eliminate the pump station was identified as being completed by 2035. The Coal Creek Springs Transmission Main project will add a pipe crossing the White River to be used for installation of a water main for Game Farm Wilderness Park. Completion of the river crossing will enable the water main project to be completed sooner and eliminate the need for pump station improvements. This project will install new main within the Game Farm Park from the existing 8" near the amphitheater to the river crossing, and from the river crossing to the existing pump station in the Wilderness area. The project will also decommission the existing pump station. As of March 13, 2023, this project is currently in the FY 2022-2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2027. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2027. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Water / Sewer
$329,774.00
Public - City
Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2027
3030 R St SE, Auburn, WA
Related To This Project
Auburn, WA
Bid Date: Mar 22 2022
Auburn, WA
Bid Date: Feb 03 2022
Auburn, WA
Bid Date: Mar 10 2022
Auburn, WA
Bid Date: Apr 05 2022
Auburn, WA
Bid Date: Apr 05 2022
Auburn, WA
Bid Date: Apr 28 2022
Auburn, WA
Bid Date: Apr 18 2022
Auburn, WA
Bid Date: Apr 21 2022
Auburn, WA
Bid Date: Feb 08 2023
Auburn, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.