BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Santa Cruz, California. Working plans call for site work for a water / sewer project.

Project ID: RFQ WT-0042 (CWO#20-003) Range of Design Consultants Opinion of Probable Construction Cost Low: $7,200,000 - High: $8,800,000 Question Deadline 10/04/2023 Deadline for RFIs questions from Contractors Project has been cancelled 54532, 91242 Project scope includes but is not limited to approximately 1600 feet of 30 inch HDPE via HDD, 1000 feet of 24 inch PVC via open cut. Project area is located near Highway 9 between Glen Arbor Road and Brackney Road in close proximity to San Lorenzo River. As of September 7, 2023, the owner has released a request for statements of qualifications. Project schedule: RFQ release 9/1/2023 SOQ due 10/7/2023 Short list of pre-qualified contractors October 2023 Construction NTP/ Mobilization March / April 2024 Construction is anticipated to require 1 year. Range of Design Consultant's Opinion of Probable Construction Cost Low: $7,200,000 - High: $8,800,000 The Project includes the installation of approximately 1,700 ft of HDD, and approximately 900 ft of open trench pipeline within private and County roads, in Ben Lomond, California, between Glen Arbor Rd and Brackney Rd. The HDD pipeline is a 24-inch (ID) HDPE pipeline. Conductor casings, approximately 108 ft and 97 ft in length, are required at each side of the HDD. The conductor casings are steel pipelines with a minimum diameter of 48-inches. The Prime Contractor's Scope of Work for the Project includes, but is not limited, to the following: a. Installation of 24" (ID) diameter HDPE/PVC pipeline and associated appurtenances between Glen Arbor Rd and Brackney Rd: i. Installation of conductor casing, approximately 108 ft and 97 ft in length, at each side of the HDD conductor casing. Conductor Casing installation work must be performed by a prequalified Conductor Casing Installation Contractor. ii. Installation of approximately 1,700 ft, 24" (ID) diameter HDPE pipeline via Horizontal Directional Drilling using the drill-and-intersect method. HDD work must be performed by a pre-qualified HDD contractor. iii. Installation of approximately 900 LF, 24" diameter PVC pipeline via conventional open-cut iv. Two tie-ins to the existing pipeline on Glen Arbor Rd and Brackney Rd. v. Restoration of work areas to pre-construction conditions

Final Planning

Water / Sewer

$8,800,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
58
Bidding Soon
1,280
All Active Projects
551
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 13, 2023

December 27, 2023

img_map_placeholder

Multiple Locations, Santa Cruz, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.