BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 14, 2025 at 7:00 PM

Updated November 15, 2025

Site work and new construction of an educational facility in Santa Cruz, California. Completed plans call for the construction of a 900,000-square-foot, 290-unit educational facility; and for site work for a educational facility.

LEED Administrator services during the design and construction phases of Student Housing West - Phase 2 Heller Development The project will include replacing the existing family student housing and childcare/early education services complex near the West Campus entrance with a new housing development of approximately 2,400 new apartment and community-living-style beds for continuing upper division undergraduate students. The scope includes site clearance, new development such as parking, roads, pathways, exterior utilities and infrastructure on an approximately 13-acre site in addition to the new building construction. The program proposes a mix of upper division undergraduate beds. The project also proposes support spaces, such as laundry facilities, mail facilities, custodial space, and storage. Centrally sited student "hubs" may include administrative and student services, multi-purpose rooms, study areas, a convenience store, and social spaces for residents and neighboring student communities. The project will be delivered over two phases of approximately 1,200 beds per phase. The selected firm will provide LEED Administration as required by applicable building codes,regulations and standards, project specifications and University of California Policy on Sustainable Practices, through the life of the aforementioned project. LEED has several rating systems, the University of California Policy on Sustainable Practices refers to LEED for Interior Design and Construction, LEED for Building Operations and Maintenance and LEED for Building Design and Construction, current version of the rating systems. The University anticipates using Master Site LEEDv4 and then individual or group LEEDv4 BD+C certifications. The consultant will be expected to work in conjunction with the project design team and applicable architectural or engineering documents, and coordinate with contractors (under a design build project delivery model) to certify the project. Questions about this RFQ or the project shall be submitted by email to the Project Manager, Domenic Gibbs at dogibbs@ucsc.edu no later than 5:00 p.m. on Friday, February 14, 2025.

Post-Bid

Educational

$750,000,000.00

Public - State/Provincial

LEED Certification, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
139
Bidding Soon
2,334
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.