BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 18, 2020 at 8:00 PM

Updated May 9, 2025

Site work for a water / sewer project in Penfield, Illinois. Completed plans call for site work for a water / sewer project.

Furnish all labor and listed materials to install a water control structure within the channel exiting the Point Pleasant wetland at Middle Fork River Forest Preserve in Champaign County, IL Construction traffic access to the site must be limited to the access locations depicted on the plans and in the image below. Construction access shall be from approximately 2525-2545 County Road 3350 N, Penfield, IL The Champaign County Forest Preserve District is seeking proposals to install a water control structure within the channel exiting the Point Pleasant wetland at Middle Fork River Forest Preserve in Champaign County, IL. All construction materials and systems shall be in accordance with applicable federal, state, local building and safety codes. Construction materials described in the Engineering Plans and not called out in the Bid Form will be supplied by the Owner and available at the project staging area noted in the Area of Work Map. No building permit is required for this project. CCFPD is an equal opportunity employer (EOE). CCFPD encourages all interested businesses to provide quotes for this work, including but not limited to small business (SBA), minority and women owned businesses (MBE/WBE). No pre-bid meeting will take place. For further information or questions, contact Michael Daab, Deputy Director for Planning and Development (217-586-3360); mdaab@ccfpd.org. For all project specification and construction questions: Michael Daab, Deputy Director for Planning and Development / 217.586.3360 / mdaab@ccfpd.org For all contract and payment questions: John Baker, Director of Business, Finance, HR / 217.586.3360 / jbaker@ccfpd.org For work schedule and site access coordination: Matt Kuntz, Middle Fork River Forest Preserve Site Superintendent / 217.595.5432 / mkuntz@ccfpd.org The successful bidder will be required to furnish a Certificate of Insurance naming the Champaign County Forest Preserve District as Co-Insured. The successful bidder will be required to furnish and pay for a Contract Bond in the amount of 100% of the Contract amount. Contract time: The Contract deadline for completion of the Point Pleasant Water Control Structure is December 31st, 2020. The Board of Commissioners of the Champaign County Forest Preserve District reserves the right to reject any, part of any, or all proposals, to waive any informality or irregularity in the proposals or the proposal process, to accept any proposals which it deems most favorable, and to continue letting from time to time as deemed necessary.

Award

Water / Sewer

$46,200.00

Public - County

Site Work

8

1

4

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
75
Bidding Soon
878
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2020

September 17, 2020

Project location map

2525 County Rd 3350 N, Penfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.