Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 29, 2021 at 7:00 PM

Updated May 9, 2025

Site work and paving for a civil project in Penfield, Illinois. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; and water / sewer project.

This work generally consists of pond dewatering; excavating soft sediment and deepening of the pond; removal of an island; grading and shaping the pond slopes and shoreline; stripping, stockpiling, and respreading a sand beach; placing and compacting a clay liner; pavement removal to install roadway culverts and pavement replacement; and placement of shoreline rip rap. Proposals must be enclosed inasealed envelope with the bidder's name and Willow Pond Restoration Project clearly marked on the outside of the envelope. The Owner has determined that the project will not be subject to State of Illinois sales tax. Thus, bidders shall not include said sales tax amounts in their bids. Contractor must submit as a bid surety a bid bond equal to 10% of the construction contract as a proposal guarantee in conformity with Illinois Statutes. The successful bidder will be required to furnish a Certificate of Insurance naming the Champaign County Forest Preserve District asCo-Insured. Contractors will be required tocomply with all federal, state and municipal laws and regulations, including those related to discrimination, prevailing wage, safety, drug-free workplace, bid rigging, human rights, preferential employment of Illinois labor and equal opportunity employment. The Board of Commissioners of the Champaign County Forest Preserve District reserves the right to reject any, part of any, or all proposals, to waive any informality or irregularity in the proposals or the proposal process, to accept any proposals which it deems most favorable, and to continue letting from time to time as deemed necessary. For further information or questions, please contact Michael Daab (217-586- 3360); mdaab@ccfpd.org. Board of Commissioners Champaign County Forest Preserve District Andrew Kerins, Secretary

Under Construction

Water / Sewer

$603,000.00

Public - County

Paving, Site Work

8

8

16

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
81
Bidding Soon
745
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 8, 2021

November 19, 2021

Project location map

3485 County Rd 2700 E, Penfield, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed