BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 16, 2023 at 7:00 PM

Updated January 29, 2024

Site work, paving and outdoor lighting for a mixed-use development in Waianae, Hawaii. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The scope of work for the Base Bid, located at the intersection of Farrington Highway with Nanaikeola Street and at the intersection of Kahuapaani Street with Ulune Street, consists of removing portions of existing traffic signal equipment, roadway pavement, curb, gutter, sidewalks, driveways, and curb ramps; installing new traffic signal equipment, curb, gutter, sidewalks, driveways, curb ramps, signing, and pavement markings; relocation of existing irrigation system; restoration of asphalt concrete roadway pavement and landscaping. The estimated cost of construction is between $2,000,000.00 and $4,000,000.00. The scope of work for Additive Alternate #1, located at the intersection of Vineyard Boulevard with Queen Emma Street, consists of removing portions of existing traffic signal equipment, roadway pavement, curb, gutter, sidewalks, and curb ramps; installing new traffic signal equipment, curb, gutter, sidewalks, curb ramp, signing, and pavement markings; relocation of existing water lateral, and irrigation system; restoration of asphalt concrete roadway pavement, restoration of Portland Cement Concrete pavement, and landscaping. The estimated cost of construction is between $1,000,000.00 and $3,000,000.00. The scope of work for the Additive Alternate #2, located at the intersection of Kalanianaole Highway with Kalaniiki Street, consists of removing portions of existing traffic signal equipment, roadway pavement, curb, gutter, sidewalks, driveways, curb ramps, terminal impact attenuators, and guardrails; installing new traffic signal equipment, curb, gutter, sidewalks, driveways, curb ramps, terminal impact attenuators, guardrails, signing, and pavement markings; relocation of existing water meter, and irrigation system; restoration of asphalt concrete roadway pavement, restoration of Portland Cement Concrete pavement, and landscaping. The estimated cost of construction is between $1,500,000.00 and $3,500,000.00. The scope of work for Additive Alternate #3, located at the intersection of H-1 Exit 26A with Koko Head Avenue, consists of removing portions of existing traffic signal equipment, roadway pavement, curb, gutter, sidewalks, driveways, and curb ramps; installing new traffic signal equipment, curb, gutter, sidewalks, driveways, curb ramps, signing, and pavement markings; relocation of existing water lateral, and irrigation system; restoration of asphalt concrete roadway pavement and landscaping. The estimated cost of construction is between $500,000.00 and $2,500,000.00.

Award

Roads / Highways

$4,618,038.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
11
Bidding Soon
256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 23, 2020

February 22, 2021

Project location map

Multiple Locations, Waianae, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.