BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Waianae, Hawaii. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The scope of work for the Base Bid, located at the intersection of Farrington Highway with Nanaikeola Street and at the intersection of Kahuapaani Street with Ulune Street, consists of removing portions of existing traffic signal equipment, roadway pavement, curb, gutter, sidewalks, driveways, and curb ramps; installing new traffic signal equipment, curb, gutter, sidewalks, driveways, curb ramps, signing, and pavement markings; relocation of existing irrigation system; restoration of asphalt concrete roadway pavement and landscaping. The estimated cost of construction is between $2,000,000.00 and $4,000,000.00. The scope of work for Additive Alternate #1, located at the intersection of Vineyard Boulevard with Queen Emma Street, consists of removing portions of existing traffic signal equipment, roadway pavement, curb, gutter, sidewalks, and curb ramps; installing new traffic signal equipment, curb, gutter, sidewalks, curb ramp, signing, and pavement markings; relocation of existing water lateral, and irrigation system; restoration of asphalt concrete roadway pavement, restoration of Portland Cement Concrete pavement, and landscaping. The estimated cost of construction is between $1,000,000.00 and $3,000,000.00. The scope of work for the Additive Alternate #2, located at the intersection of Kalanianaole Highway with Kalaniiki Street, consists of removing portions of existing traffic signal equipment, roadway pavement, curb, gutter, sidewalks, driveways, curb ramps, terminal impact attenuators, and guardrails; installing new traffic signal equipment, curb, gutter, sidewalks, driveways, curb ramps, terminal impact attenuators, guardrails, signing, and pavement markings; relocation of existing water meter, and irrigation system; restoration of asphalt concrete roadway pavement, restoration of Portland Cement Concrete pavement, and landscaping. The estimated cost of construction is between $1,500,000.00 and $3,500,000.00. The scope of work for Additive Alternate #3, located at the intersection of H-1 Exit 26A with Koko Head Avenue, consists of removing portions of existing traffic signal equipment, roadway pavement, curb, gutter, sidewalks, driveways, and curb ramps; installing new traffic signal equipment, curb, gutter, sidewalks, driveways, curb ramps, signing, and pavement markings; relocation of existing water lateral, and irrigation system; restoration of asphalt concrete roadway pavement and landscaping. The estimated cost of construction is between $500,000.00 and $2,500,000.00.

Award

Roads / Highways

$4,618,038.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
25
Bidding Soon
267
All Active Projects
110
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 23, 2020

February 22, 2021

March 14, 2022

img_map_placeholder

Multiple Locations, Waianae, HI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.