Renovation of a water / sewer project in Donora, Pennsylvania. Completed plans call for the renovation of a water / sewer project.
General was awarded to JP Environmental LLC in the amount of $739,000.00 Electrical was awarded to Genesis electric in the amount of $411,282.00 --------------------------------------------------------------------------------------- TOTAL AWARD AMOUNT: $1,150,282.00 Installation of new mixers in the aerobic digester tanks. Modification of existing aeration manifolds in the aerobic digester tanks to accommodate new mixers. Installation of variable frequency drives (VFDs) and new check valves on the plant blowers. Installation of a control system for regulation of airflow to each aerobic digester and contact/stabilization tank, including instrumentation, valving, and process control. Installation of a new Motor Control Center (MCC). Modifications to the south wall of the blower room to accommodate new equipment, including removal of the existing window and relocation of the existing door. The project will include an upgrade to the existing aeration system to allow plant staff to control the dissolved oxygen (DO) concentration in each tank. The three plant blowers will be retrofitted with VFDs, and the existing check valves will be replaced. DO sensors will be installed in each of the aerobic digester and contact/stabilization tanks. Air flow sensors and control valves will be installed on the air supply line to each tank to allow for individual tank airflow rate adjustment. A third-party process control system will be installed that will vary the blower speed using the VFDs and balance airflow to each tank using the automated valves. New mixers will be installed in the digester tanks to improve process efficiency. The existing aerobic digester manifolds will be modified to accommodate the mixers, and a new purge sump assembly will be installed on each aerobic digester manifold. A new MCC will be installed. To accommodate the new MCC and to allow for the transition of equipment from the old MCC to the new unit, the south wall of the blower room will be modified. Modifications will include relocation of the existing double door and removal of the existing window. The Mon Valley Sewage Authority reserves the right to accept or reject any or all bids and to waive any informality in any bids should it consider same to be in its best interest. Bids may not be withdrawn for a period of sixty (60) days after date of receiving bids. The Owner has current Pennsylvania sales tax exemption status, which applies only to those items for which an exemption may be claimed under applicable State Sales and Use Tax Regulation. All inquiries should be directed to Scott M. Duda, P.E. at 724-944-5567 or sduda@wadetrim.com. The Work will be substantially completed within one hundred and eighty consecutive calendar days (6 months) after the date noted in the Notice to Proceed and completed and ready for final payment in accordance with paragraphs 14.09 and 14.10 of the General Conditions within 210 consecutive calendar days (7 month) after the date when the Contract Times commence to run.
Award
Water / Sewer
$1,150,282.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 8, 2020
October 19, 2020
20 S Washington St, Donora, PA
Related To This Project
Donora, PA
Bid Date: May 06 2022
Donora, PA
Bid Date: Jun 13 2022
Donora, PA
Bid Date: Dec 12 2019
Donora, PA
Bid Date: Jul 29 2022
Donora, PA
Bid Date: Feb 13 2023
Donora, PA
Bid Date: Mar 20 2024
Donora, PA
Bid Date: Aug 14 2023
Donora, PA
Bid Date: Feb 22 2022
Donora, PA
Bid Date: Jan 09 2020
Girardville, PA
Bid Date: Mar 25 2022
Ligonier, PA
Bid Date: Mar 04 2022
Stowe, PA
Bid Date: Nov 02 2021
New Bloomfield, PA
Bid Date: Nov 05 2021
Harrisburg, PA
Bid Date: Dec 01 2021
Penn Hills, PA
Bid Date: Apr 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.