BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in San Rafael, California. Completed plans call for the renovation of a water / sewer project.

The anticipated project start date is 12/1/2020 and the estimated project end date is 12/31/2021 The work consists of construction of a new dual-fuel (biogas and natural gas) internal combustion engine cogeneration system. To accomplish this work, the Contractor will have to complete the work items indicated on the Drawings and Specifications, including but not limited to the following: - Demolition of two existing supply fans, sky lights, and conduits within the existing Solids Handling Building. - Installation of one new owner-furnished cogeneration engine-generator, remote radiator, heat recovery and exhaust silencer units, two new urea totes and scale systems, static mixer, two heat recovery pumps, other ancillary equipment, and related items. - Procurement and installation of required piping, insulation, and instrumentation between owner-furnished equipment. - Procurement and installation of a hot water heat exchanger, hot water pump and associated piping to connect to the Plant's existing Hot Water Loop. - Procurement and installation of bypass biogas piping and associated flow meters and valves to recirculate biogas through the existing biogas conditioning system. - Procurement and installation of two new supply fans on the roof of the Solids Handling Building and associated ducting inside the existing engine room. - Replacement of portions of the existing Solids Handling Building roofing material. - Procurement and installation of one new programmable logic controller, owner- furnished cogeneration switchgear, owner- furnished vendor control panels, and related items. - Connect new heat recovery system to existing Hot Water Loop piping. - Connect new biogas and natural gas piping to existing systems. - Repair and reconstruction of existing improvements affected by the Work, and incidentals for a complete usable facility. Project Duration: 400 Calendar Days Liquidated Damages : $1,000.00 Per Calendar Day Bid Bond Percentage : 10% Pre-Qualification for Bidders:Not Required License Type Required:A Project/Contract Number:21-05

Award

Water / Sewer

$3,583,800.00

Public - County

Renovation

139

1

17

8

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
49
Bidding Soon
1,728
All Active Projects
737
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 29, 2020

December 1, 2020

img_map_placeholder

1301 Andersen Dr, San Rafael, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.