Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a residential development in Milwaukee, Wisconsin. Completed plans call for the renovation of a residential development.
Furnish labor, material and services necessary to remove and replace roof on house and garage, at 5845 North 79" Street, Milwaukee, as per the following scope: Note: Contractor shall perform work in accordance with all lead and asbestos removing procedures including, but not limited to, the containment and removal of materials on the ground. Contractor shall provide a dumpster for the containment of debris at commencement of project. Bagging is not acceptable. Contractor will be responsible for any damages done to lawn, or to neighbor's property. Site should be cleaned up DAILY. Storage of materials on site is not allowed. Contractor is responsible for providing a power source. Overall job is to be professional and done in a workmanlike manner. ROOF 1. Safeguard property from falling objects coming from the roof of house and garage. 2. Remove existing shingles, drip edge, de-icing systems, vents and any damaged or rotted roof sheathing and/or deck board. NOTE: Coordinate with manager for viewing of roof condition, and for any necessary repairs, prior to installing new roofing materials. 3. Replace any rotted or missing boards and roof sheathing, and properly prepare surface for roofing material. 4. Dispose of any cable lines, antenna and satellite dishes, etc. 5. Install new gutter apron in guttered areas and new drip edge on eaves as applicable. Space Gutter apron to receive gutter behind the flashing, or install gutter when installing gutter apron flashing. 6. Install new 3' wide ice and water shield at base of roof covering gutter apron on roof. Install 18" wide ice and water shield on eaves covering top of drip edge flashing. 7. Install 30 Ib. felt paper on balance of roof from edge to edge of roof. 8. Install starter strips at base of roof and roof eaves. Step flashing (4x4x8 galvanized) should be used at all edges, chimneys and where else applicable. Note: flashing shall be installed under the shingles. All joints must be fitted tightly, accurately, and strapped securely to house. Not to secure roof straps on shingles. 9. Install ridge vent. Certainteed 12" Filtered Exhaust Vent, or approved equivalent compatible with roofing system. Seal openings from any prior venting. Use manufacturer supplied cap shingles of matching color to dimensional shingles for ridge caps. Any exposed nail heads to be covered with roof caulk or tar. lf bidding on a different brand, please specify: 10. Install new lead vent stack covers for all existing plumbing roof vents. 11. Install 30 year dimensional shingles Landmark Certainteed, or approved equivalent. HOUSING MANAGER MUST APPROVE THE COLOR BEFORE INSTALLATION. Use a minimum of 4 galvanized nails per shingle; nails to be sufficient in length to secure shingle, and install at a 90 degree angle to surface. Installation to follow manufacturer guidelines. Work shall commence within 10 business days of contract award and completed within 2 weeks of start date (weather permitting). Contact Manager, Richard Pawlitzke with any questions about this scope of work: cell: 414-639-4892/office: 414-286-8534/email: rpawli@hacm.org Contractor must deliver written notice to resident, no less than 48 hours prior to work commencing. Provide a copy of the notice to Housing Manager. Contractor must have a City of Milwaukee License License Number: License Expiration Date: Contractor will be held liable for any damage caused to the building and ancillary structure, and/or injury to the occupants resulting from the execution of the work or from not exercising proper precautionary protective measures. Any cost of repair/replacement resulting from damages shall be at the contractor's expense. Contractor shall comply with all applicable state, federal and local codes, and pay all permits, licenses and certificates, and other fees as required by the work. Contractor responsible for pulling and closing all necessary permits.''' The Contractor and its subcontractors shall be responsible for responding to any requests for data or information by the noted response due dates, and shall check the electronic system on a regular basis to manage contact information and contract records. The Contractor shall also be responsible for ensuring that all subcontractors have completed all requested items with complete and accurate information and that their contact information is current. The Purchasing Division may determine the award of a tie bid using a method of chance. Tie bids are defined as all things being equal, such as price, quality, services, etc. Attachments Insurance Requirements Davis Bacon Wage Decision WI190027, Modification Number 2, Publication Date 06/19/2020 General Contract Conditions for Small Construction/Development Contracts Certified Payroll Electronic Submission Hazardous Materials (Asbestos and Lead) -- Requirements and Disclosure Hazardous Materials (Asbestos and Lead) -- Procedures for Repair and Modernization Hazardous Materials (Asbestos and Lead) -- Quick Reference Section 3 Plan/Requirements (Complete/sign applicable pages and return with bid). If you have any Section 3 questions, please contact Gabriel DeVougas, Section 3 Coordinator, at 414-286-2940 or gmdevou@hacm.orc
Under Construction
Residential Subdivision
$9,325.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 28, 2020
October 22, 2020
5845 N 79th St, Milwaukee, WI
Related To This Project
Milwaukee, WI
Bid Date: Apr 26 2019
Milwaukee, WI
Bid Date: Mar 24 2020
Milwaukee, WI
Bid Date: Apr 12 2019
Milwaukee, WI
Bid Date: May 08 2020
Milwaukee, WI
Bid Date: Jun 23 2020
Milwaukee, WI
Bid Date: Jun 24 2020
Milwaukee, WI
Bid Date: Jun 19 2020
Milwaukee, WI
Bid Date: May 04 2020
Milwaukee, WI
Bid Date: Aug 06 2021
Milwaukee, WI
Bid Date: Oct 08 2021
Milwaukee, WI
Bid Date: Oct 18 2021
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Aug 06 2021
Milwaukee, WI
Bid Date: Apr 07 2021
Milwaukee, WI
Bid Date: Jan 05 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.