Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published November 11, 2020 at 7:00 PM
Updated March 21, 2025
Site work, paving and new construction of a civil project in Boone, Colorado. Completed plans call for the construction of a road / highway.
For Water System Improvements - CDBG Project consisting of two Schedules of Work. Schedule One consists of 4,000 lineal feet (LF) of 6" PVC water mains; 1,013 LF of 4" PVC water mains; 37 LF of 3" PVC water mains; 24 LF of PVC water mains; 9,372 LF of 8" PVC water transmission lines; 838 LF of 6" HDPE directional drilling; 235 LF of 12" steel bore and jacking casing pipe; 49 - 8", 6" and 4" valves; 3 fire hydrant assemblies; remove and reinstall an existing fire hydrant assembly; remove and salvage two fire hydrant assemblies; four 4" post hydrant assemblies; 35 - 34" water service taps; 450 LF of 34" service line; connections to the existing water distribution system; installation of a 1-inch entry point sample yard hydrant assembly and piping; 196 LF of flowable fill installed around new water mains; new chlorination building consisting of 10' x 10' fiberglass reinforced building, concrete foundation, internal piping, chlorine feed system, shelves, pressure gauges, heating, ventilation, electrical, site work, yard piping, flow meters, electrical control and power conductors and conduits; 7 combination air vacuum relief valve assemblies inside 6' diameter manhole; 5' ID manhole housing new well meter; 5' ID manhole housing altitude valve; 5 locking mini tracer wire test boxes; 8 carsonite marker posts; 9 square yards (SY) of 3" thick hot bituminous pavement; seeding; and equipment consisting of chlorination feed system, soda ash feed system, 4" magmeter and 4" pressure reducing valve. Schedule 2 consists of the installation of a new Arkansas Valley Well including 44' deep well with 12" bore hole, 20 LF of 8" well casing and 19 LF of 8" well screen; well development, 24-hour pump test, installation of new submersible motor, drop pipe, electrical and pitless adapter together with appurtenances and incidentals of construction A certified check or bank draft, payable to the order of the Town of Boone (Owner) negotiable U.S. Government bonds (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid.Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. Bidders shall note that funding for this project is being made available, in part, through a Community Development Block Grant. The requirements associated with this funding source include, but are not limited to, provisions for Davis Bacon wages that set forth the minimum salaries and wages within the contract documents that must be paid on the project. The current applicable Heavy Decision is Decision Number CO20200002, 08/28/2020, Modification Number 2, dated 08/28/2020.In the event that the Bidder anticipates hiring employees to work on this job, the Bidder should contact the local manpower office for qualified candidates. (Section Prior to the awarding of the Contract, the Town of Boone may defer its decision for a period not to exceed sixty (60) days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contracts. Bid Results 1.SCHEDULE 1 - WATER TRANSMISSION LINES- Pate Construction Co., Inc.- $886,313 2.SCHEDULE 2 - ARKANSAS WELL- RMS Utiltiies, Inc - $51,345.00 3.SCHEDULE 3 - PIPELINE MATERIAL ACQUISITION- Core & Main- $70,426
Award
Water / Sewer
$70,426.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 9, 2020
December 8, 2020
Multiple Locations, Boone, CO
Related To This Project
Boone, CO
Bid Date: Jul 28 2023
Boone, CO
Bid Date: Apr 06 2023
Boone, CO
Bid Date: Mar 02 2021
Colorado Springs, CO
Bid Date: Apr 02 2025
Frisco, CO
Bid Date: Apr 07 2025
Westminster, CO
Bid Date: Apr 16 2025
Denver, CO
Bid Date: Apr 04 2025
Frisco, CO
Bid Date: Apr 02 2025
Brighton, CO
Bid Date: Apr 09 2025
Gunnison, CO
Bid Date: Mar 20 2025
Pueblo, CO
Bid Date: Apr 16 2025
Fort Collins, CO
Bid Date: Apr 11 2025
Englewood, CO
Bid Date: Apr 15 2025
Loveland, CO
Bid Date: Apr 11 2025
Georgetown, CO
Bid Date: Apr 07 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
