Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
New construction and renovation of a mixed-use development in Morgantown, West Virginia. Completed plans call for the renovation of a educational facility.
This project will be a renovation of an existing structure built in 1975 for West Virginia University. Provide all labor, materials, equipment and supervision for all electric related work as identified in the drawings and specifications All questions and clarifications are to be directed directly to MARCH-WESTIN at: mmcmillian@marchwestin.com. Cutoff for Questions: September 24, 2020 at 5:00 pm Liquidated Damages shall be One Thousand, Five Hundred Dollars ($1,500.00) per calendar day of delay in achieving Substantial Completion, not as a penalty, but a reasonable assessment of loss of use of the facility for its intended purpose. Project Start Date: Mid-October 2020 Substantial Completion Date: Mid-June 2021 Matthew McMillian is the project contact for this project. Please call at 304.599.4880, or via email at mmcmillian@marchwestin.com. *The value reflects the overall value and not necessarily this particular package* This bid package must include all electric related work as identified in the drawings and specifications. Lump sum award will be made to one subcontractor and it shall be the responsibility of that subcontractor to safely coordinate activities between disciplines. Please note that the bid documents are at the 95% Construction Documents (CD) stage and assumptions must be made in your bid to bring the design to 100% Construction Documents (CD). If major revisions to budget or design occur during this last design stage, we may require bids to be revised or entire package to be rebid. Submitted bids must be complete, including all material, labor, equipment, administrative labor (associated preconstruction meetings, special inspectors, submittals), disposal fees, bonding (as applicable), insurance, B&O tax, and sales tax. Scope is to include power distribution, lighting, low voltage, access control, and fire alarm. Scope includes furnishing dumpsters for, transportation of, and proper disposal of debris. This bid package must include all frames, glazing, and hardware for the storefront. Lump sum award will be made to one subcontractor and it shall be the responsibility of that subcontractor to safely coordinate activities between disciplines. Please note that the bid documents are at the 95% Construction Documents (CD) stage and assumptions must be made in your bid to bring the design to 100% Construction Documents (CD). If major revisions to budget or design occur during this last design stage, we may require bids to be revised or entire package to be rebid. Submitted bids must be complete, including all material, labor, equipment, administrative labor (associated preconstruction meetings, special inspectors, submittals), disposal fees, bonding (as applicable), insurance, B&O tax, and sales tax. Scope is to include storefront and borrowed lite frames, aluminum doors, glazing, hardware, and integrated sunshade system. Exclude card reader materials or installation.
Occupancy
Educational
$35,000,000.00
Public - State/Provincial
New Construction, Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 14, 2020
December 14, 2020
85 Coliseum Drive, Morgantown, WV
Related To This Project
Morgantown, WV
Bid Date: Nov 14 2024
Morgantown, WV
Bid Date: Feb 29 2024
Morgantown, WV
Bid Date: Feb 20 2024
Morgantown, WV
Bid Date: Feb 20 2024
Morgantown, WV
Bid Date: Feb 29 2024
Morgantown, WV
Bid Date: Mar 12 2024
Morgantown, WV
Bid Date: Feb 27 2024
Morgantown, WV
Bid Date: Feb 09 2024
Morgantown, WV
Bid Date: Mar 07 2024
Morgantown, WV
Bid Date: Feb 14 2024
Morgantown, WV
Bid Date: Feb 01 2024
Morgantown, WV
Bid Date: Jan 25 2024
Morgantown, WV
Bid Date: Jan 09 2024
Morgantown, WV
Bid Date: Dec 29 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.