Demolition, site work, paving and new construction of a mixed-use development in Pinedale, Wyoming. Completed plans call for the demolition of a transportation facility; for the construction of a transportation facility; for site work for a transportation facility; and for paving for a transportation facility.

A total of 70 working days will be allowed for the Contract for Bid Package A with Substantial Completion date of November 1st, 2021 and Final Completion date of December 1st, 2021. A total of 20 working days will be allowed for the Contract for Bid Package B with a Substantial Completion date of June 15th, 2021 and a Final Completion date of July 30th, 2021. A total of 80 working days will be allowed for the Contract if Bid Package A and Bid Package B are awarded to the same Contractor with a Substantial Completion date of November 1st, 2021 and Final Completion date of December 1st, 2020. The project will include the design, bidding, and construction of the Expand E GA Apron Project which includes earthwork, grading, P-209 base course, P-401 asphalt, striping, concrete work, removal of the existing fuel farm and installation of a new fuel farm. Bid Package A will consist of the main apron expansion work and Bid Package B will consist of the new fuel farm work. Bids will be evaluated for each Bid Package and awarded to the lowest responsive bidder for each package individually. No bids will be received after the specified hour and date and may not be withdrawn after the time fixed for opening them. The owner reserves the right to waive irregularities in the bids and reject any and all bids. No bids will be considered in which the Proposal, Specifications or any provisions have been modified. Bids will be received for up to two prime Contracts (may be one prime contract if one Contractor is low bid for both bid packages). Bids shall be on a unit price basis, as indicated in the Bid Form. The bidder must supply all information required by the bid or proposal forms and specifications. Each bid must be accompanied either by a certified check, payable to the Town of Pinedale in the amount of five percent (5%) of the bid, or by a Bid Bond in a like amount and executed by an approved surety company. The check or bond will be retained by the Owner as liquidated damages if the successful bidder refuses or fails to enter into contract and performance bond in accord with his bid within fifteen (15) days after date of notification of award. Minimum wage rates as established by the Secretary of Labor are applicable to the work performed on this project. The Issuing Office for the Bidding Documents, consisting of Project Manual and Plan Set, is: T-O Engineers, 502 33rd Street, Cody, WY 82414. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Thursdays between the hours of 8:00 and 5:00 and Fridays between the hours of 8:00 and 12:00 and may obtain copies of the Bidding Documents from the Issuing Office as described. Bids may not be withdrawn after the time fixed for submitting them. The Owner reserves the right to waive irregularities in the bids and reject any and all bids. Bid Package A 1A HK Contractors:-$2382499.00 Bid Package A 2A HK Contractors:-$30105.00 Bid Package A 3A HK Contractors:-$13065.00 Bid Package B 1B Avail vally construction:-$232810.00 Bid Package B 2B Granite Petrolium:-$583202.00

Award

Transportation Terminals

$2,425,669.00

Public - City

Demolition, New Construction, Paving, Site Work

35

12

7

8

Subscribe For Documents

41 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
39
All Active Projects
18
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2020

November 23, 2020

img_map_placeholder

9357 US-191, Pinedale, WY


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.