BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 12, 2021 at 7:00 PM

Updated January 26, 2024

Renovation of a medical facility in Lincoln, Nebraska. Completed plans call for the renovation of a medical facility.

A general contractor has been awarded. Construction began January 11, 2021. Project 'A' consists of numerous selective renovations to buildings 3, 5 & 10 at Lincoln Regional Center in order to reduce identified potential patient safety risks that the current environment presents. Items include toilet fixture & accessory replacement, finish replacement, door and door hardware replacement, lighting replacement, and other minor renovations associated with improving patient safety Project 'B' consists of architectural, electrical, and mechanical modifications to facilitate a fan coil replacement on level two at Building #10 Lincoln Regional Center. The new fan coils will be installed above the corridor ceiling to condition the patient rooms and common spaces. The corridor ceiling will be replaced with a base bid acoustical panel ceiling and there will be an alternate to provide a more secure ceiling per Alternate A-1. The lighting within the corridor will be replaced with LED high performance fixtures. There will be modifications in the lower level mechanical room which consist of converting the existing two pipe system to a four pipe system to provide heating and cooling all year long. A new air cooled chiller will be bid as an alternate to the project to replace an existing McQuay chiller that is no longer operational. The project will be phased and occupied during construction, there is hazardous materials that will be abated as part of Project C to accommodate the installation for new equipment. All applicable Federal, State and local codes shall be followed. Project 'C' requires a Nebraska licensed business entity to abate fireproofing and pipe insulation from building 10 at the Lincoln Regional Center in approximately 3 phases. Abatement contractor shall construct full containments prior to demolition of ceilings and ductwork in close proximity to asbestos fireproofing, remove the fireproofing on structural beams in select areas, and remove associated overspray. Additionally, abatement contractor will be responsible for making cuts into walls and ceilings that may have asbestos overspray present, clean exposed reachable areas and encapsulate in preparation for installation of new ductwork. The abatement contractor will be responsible for filing and paying for related notifications and for final disposal of asbestos containing waste. All work shall be in accordance with industrial standards as well as all Federal, State and local regulations." A digital download of the complete set is available for a non-refundable fee of $15.00 paid to A&D Technical Supply Co. Project Location: 801 W Prospector Pl, Lincoln NE 68522

Under Construction

Medical

$700,000.00

Public - State/Provincial

Renovation

112

37

25

4

Subscribe For Documents

39 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
90
Bidding Soon
862
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 10, 2020

January 11, 2021

Project location map

801 W Prospector Pl, Lincoln, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.